• 联系所有中国客户技术总监”、“设计工程师”、“采购人员”以及质量经理”的协助下回答客户提出的所有问题

    Liaise with all China customers answering all questions with assistance from Technical Director, Design Engineer, Purchasing Officer and Quality Manager as required.

    youdao

  • 设计工程师负责分析结果进行评审按照标准载荷载荷要求,对载荷进行调整相关事宜架集团工程总监作出最终决定

    Review of the results will be performed by a Design engineer and decisions regarding modification to standard load group loadings will be determined by the PSG Engineering Director.

    youdao

  • 设计输出文件评审工作以下设计人员负责设计人员必须参加原始设计工作,并且必须为架集团工程总监技术总监指定的设计人员。

    Design Output documentation shall be reviewed by a design personnel not responsible for the original design and approved by either the PSG Engineering or Technical Director.

    youdao

  • 上述文件采用唯一识别号,并工程总监指定设计工程编制

    The above documents which are uniquely identified are prepared by a design engineer designated by the Engineering Director.

    youdao

  • 上述文件采用唯一识别号,并工程总监指定设计工程编制

    The above documents which are uniquely identified are prepared by a design engineer designated by the Engineering Director.