综合传统方法和PIV方法两种方法的优点,验证了TJ - 4边界层风洞的流场品质达到了设计要求。
Combining the merits of the traditional method and PIV method, it is proved that TJ-4 boundary layer wind tunnel comes up to the designed standard.
实验证明,该设计方案能够提高产品质量和劳动生产率,减轻工人的劳动强度。
The process has been implemented in operation successfully, and has got great achievement in increasing productivity, improving product quality and reducing labor intensity as well.
实验证明,该设计方案能够提高产品质量和劳动生产率,减轻工人的劳动强度。
The process has been implemented in operation successfully, and has got great achievement in increasing productivity, improving product quality and reducing labor intensity as well.
应用推荐