文章针对基于JIT思想建立的一种批量计划和作业排序集成问题,建立整体模型,设计了一种启发式算法采用集成方法求求解。
A monolithic model of the lot-sizing and scheduling problem based on the JIT strategy has been proposed in this paper, and a heuristic algorithm using integrated method has been designed to solve it.
对工艺设计与生产调度集成的必要性和可行性进行了分析,讨论了工艺设计与车间作业计划之间的关系。
The necessity and feasibility of the integration of process planning and production scheduling and the relations between CAPP and shop job scheduling are analyzed.
对工艺设计与生产调度集成的必要性和可行性进行了分析,讨论了工艺设计与车间作业计划之间的关系。
The necessity and feasibility of the integration of process planning and production scheduling and the relations between CAPP and shop job scheduling are analyzed.
应用推荐