燃气装配工安装,检查,维修和保养住宅,商业和工业机构的天然气管道和燃气设备,如仪表,稳压器和供热单位。
Gas fitters install, inspect, repair and maintain gas lines and gas equipment such as meters, regulators and heating units in residential, commercial and industrial establishments.
使用伏米,电流表和其他电子测量仪器和设备,检查和测试已安装电气设备及仪器,定位电气故障和检查其操作。
Inspect and test installed electrical equipment and apparatus to locate electrical faults and check their operation, using volt meters, ammeters and other electrical test instruments and equipment.
适应性可以通过设备检查并按安装说明书来检查。
Compliance is checked by inspection of the equipment and the installation instructions.
检查相关的系统及设备已安装完毕,并检验合格。
Check interrelated system and equipments have been installed and checked eligibility.
我们要重新检查以下有关设备、管路、电缆等安装方面的缺陷。
We'll examine again the defects in the installation of the following related equipment, pipe lines and cables.
检查所有气涨式救生筏,救生衣和救生圈等的种类、数量、布置和安装是否符合设计图纸,所有的救生设备应具有合格证书。
Inspect the category, amount, and fixing of all inflatable life raft, lifejacket and lifebuoy whether according to design drawing, and all life saving appliance shall have the qualified certificate.
声卡驱动程序正确安装后如果还是没有声音,检查下面两个方面:1、在“设备管理器”里面禁用了声卡。
Sound card driver is properly installed and if it is still no sound , check the following two aspects: one, in the "Device Manager" there's sound card is disabled .
电厂调试过程是对电厂设计、设备制造和安装质量的一次全面检查。
The power plant debugging process is to the power plant design, the equipment manufacture and an installment quality overall check.
一旦被安装上,这款软件就会像Windows组件或者其他相关设备一样更新,并且会有规律地检查主机是否受到威胁。
Once installed, the software gets updates about known issues with Windows or any connected devices, and regularly checks to see if a host machine has fallen victim.
包括:1、安装前的准备;2、设备的开箱检查和验收,各设备基础的检查和校正;3、各主要设备和辅助设备的就位;4、锅炉烟道系统的制作及安装。
Including: 1, Before installation: 2 the open-package inspection and acceptance of the equipment, the inspection and calibration equipment foundation, 3 the main equipment and auxiliary equipment 4.
安装检查&测量应在主要结构设备安装前后进行。 在设备冷试车之前应联合检查设备对位情况。
Assembly checks &survey to be taken before and after erection of major structurals 7 equipments. Joint record for checking of alignments to be made prior to cold trial of equipments.
安装检查&测量应在主要结构设备安装前后进行。 在设备冷试车之前应联合检查设备对位情况。
Assembly checks &survey to be taken before and after erection of major structurals 7 equipments. Joint record for checking of alignments to be made prior to cold trial of equipments.