管架集团工程总监(PSG)将对照供应商的建议要求,对经认可的设计报告进行评审,并提出相关行动意见。
The PSG Engineering Director will review the approved design report against the proposed deviation and advise on a course of action as appropriate.
评审人员,将供应商提出的建议要求记录在经认可的设计报告中,并将详情提交给管架集团工程总监(PSG)评审和验收。
The reviewer will consider the implications of the proposed deviation on approved design reports and in such instances will forward details to the PSG Engineering Director for review and acceptance.
拒绝,要求重新设计。如果客户提出的替代方案可以被接受,而需要对经认可的设计资料进行修订时,将与该供应商联系,要求其接受附带成本费用。
Reject subject to redesign. When a deviation may be accepted but would require revision to approved design data, the vendor will be contacted requesting that associated costs are accepted.
当采购方认为双方共同协商的工艺设计对它的独特需要是必不可少时,可以提出要求,没有得到采购方的认可,事先不得擅自改变工艺设计和操作方法。
When the purchaser that mutual consultation process design for its unique needs is essential, can request, no purchaser approval, without changing the prior process design and method of operation.
要求有与职业高度相关的全职工作经验。精光设计师注册会被高度认可。
Employment undertaking full time employment in highly relevant tasks as a Landscape Architect is required. Registration as a Landscape Architect will be highly regarded.
此标准意在阐述韦巴斯特关于夹具和检具在设计,制造认可中的系统要求。
The intent of this standard is to specify Webasto Roof Systems requirements for design, build, certification and approval of gauges and check fixtures.
所有的吊机设计和制造皆满足任何一家船级社的要求,并可获得船级社的认可。
The cranes designed and built to meet all requirements from any recognized Classification Society and be certified by them.
所有的吊机设计和制造皆满足任何一家船级社的要求,并可获得船级社的认可。
The cranes designed and built to meet all requirements from any recognized Classification Society and be certified by them.
应用推荐