• 之后,Google每隔一段时间下载这些文件确保使用最新信息计算路线

    After that, Google will periodically download the files to ensure that the latest information is used to calculate routes.

    youdao

  • 可以通过几个步骤实现—— 首先是地理编码,接着是标点,再通过标点计算路线最后获得线路事件信息以及交通信息

    This can be implemented in several stepsgeocode start, end and via points, calculate route, get events information around the route, get traffic information for a route.

    youdao

  • 大量仿真计算结果进行统计分析,可以得到工期关键路线概率分布结果,施工管理提供更多信息

    After enough turns of simulation, the distribution of the total work period can be determined, at the same time the critical path can be found in the probability concept.

    youdao

  • 通过工艺路线中设置的加工时间计算出来的生产完成时间位于通过物料数据维护内加工时间计算出来的工完成日期之后条例外信息就会产生。

    64:The production finish date calculated using the routing lies after the order finish date that was calculated using the in-house processing time in the material master record.

    youdao

  • 通过工艺路线中设置的加工时间计算出来的生产完成时间位于通过物料数据维护内加工时间计算出来的工完成日期之后条例外信息就会产生。

    64:The production finish date calculated using the routing lies after the order finish date that was calculated using the in-house processing time in the material master record.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定