资源分配与多计划调度RAMPS ?
由于计划调度问题本身的复杂性,很难寻求到最优解。
It is very difficult for solving the planning and scheduling problem because of its complexity.
因此,面向MES的计划调度研究成为国内外诸多企业中的热点问题。
Therefore, the planning and scheduling faced on MES is now a hot issue of many enterprises.
这种方法为CAPP与生产计划调度的一体化集成提供了一种新的途径。
This method offers a new effective approach to implement CAPP integrated with production planning and scheduling.
计划调度基本上就是一个时间框方法,定义应该完成的交互和需求的时间范围。
Scheduling is basically a time box method that defines the period of time for an iteration and the requirements that should be completed within that time frame.
介绍了聚合过程的模拟、先进控制,配方切换管理,实时优化控制和计划调度的软件技术。
The polymerization process simulation, advanced process control, recipe transaction management, real time optimization and planning technologies are described separately.
文章将蚁群算法应用于计划调度的工期-费用优化问题之中,得到一种精确、全面,求解效率高的优化方法。
The paper applies ant colony algorithm to network planning time-cost optimization problems, thereby getting a accurate, comprehensive and efficient solution optimization method.
对锁较长时间的控制也会使处理器违反计划调度,也就是说,这会导致一个拥有较高优先级的进程不得不等待CPU。
Long lock hold times also keep the current processor from scheduling, meaning that a higher priority process-which really should be able to get the CPU-may have to wait.
在FMS中,生产计划调度与控制是FMS运行控制系统的核心,是决定FMS能否取得预期经济效益的关键技术之一。
The control and scheduling of production planning of FMS act as the core of FMS running control system, and one of the key technologies as well which decide if FMS can obtain anticipated profit.
然而,这种通过引入MES来加强车间级的生产计划调度、提高中长期计划的运行效率的方法在实际实施过程中遇到了很多问题。
However, this way of introducing MES to strengthen job-shop scheduling and improve the running efficiency of plans faces many problems in the process.
您应该能够通过分析组件固有的复杂性和风险影响因素来在体系结构的帮助下支持进行准确的计划和调度。
You should be able to support accurate planning and scheduling with the help of the architecture by analyzing the complexity and risk factors inherent in the components.
超线程 是以一种高效的方式实际调度不同线程执行计划的能力。
Hyper-threading is the ability to essentially schedule separate thread execution plans in a highly efficient manner.
调度设施的设计不要求存放工具目录数据库和计划运行任务的DB2UDB服务器是同一个服务器。
The scheduling facilities are designed such that the tools catalog database does not need to reside on the same DB2 UDB server where the tasks are scheduled to run.
LotusWorkflow是一种应用程序,可以帮助组织计划、调度、跟踪、监控和存档基于文档的工作和项目。
Lotus Workflow is an application that allows your organization to plan, schedule, track, monitor, and archive its document-based work and projects.
现在,要为新任务指定调度计划,见图19。
Now you are asked to specify the schedule for the new task as Figure 19 indicates.
DocumentManager缓存服务有一个可配置的刷新 Document Manager 服务器上缓存的调度计划。
The Document Manager cache service has a configurable schedule to refresh the cache on the Document Manager server.
工具目录数据库包含在DB2UDB服务器上调度运行的所有任务的元数据(比如计划在每个周日早上一点钟运行的备份任务)。
The tools catalog database contains all the metadata about the tasks that are scheduled to run on the DB2 UDB server (for example, a backup task scheduled to run every Sunday at 1:00 a.m.).
同样,DocumentManagerDesktop客户机也有一个缓存刷新和清理调度计划。
Likewise, the Document Manager Desktop clients also have a cache refresh and purge schedule.
这些缓存刷新和清理调度计划是在DocumentManagerDesigner管理客户机中定义的。
These cache refresh and purge schedules are defined in the Document Manager Designer administration client.
集群控制器收集关于特定的节点控制器上的VM运行的信息,并调度其运行计划,以及管理虚拟实例网络。
The cluster controllers gather information about and schedules VM execution on specific node controllers, as well as manages virtual instance network.
对于一个项目来说,管理人员创建工作计划、为“小组”召集开发人员并保持每个人都有任务、按调度进行并且开销在预算内。
For a software project, management creates work plans, recruits developers for the "team," and keeps everybody on task, on schedule, and on budget.
第三次执行任务时,管理员应该自动执行并监视任务,以后应该一直按调度计划自动执行此任务。
The third time the task is performed, it should be automated and monitored by the administrator, and all future instances of the task being performed should be scheduled and automated.
可以按调度计划执行复制,也可以在主服务器上完成修改之后立即复制。
The replication can be configured to occur on a scheduled basis or immediately after the change is completed on the master server.
按照这种结构,构建企业的集成化生产管理系统,将会实现生产计划的实时调度以及生产过程的实时控制。
According to this structure, constructing integrated production management system, real-time scheduling of production planning and real-time control of production process will be realized.
使用描述端到端作业流程的操作计划的作业调度器。
Job schedulers with operational plans that describe end-to-end job flows.
显示何时将调度覆盖的记录:如果WIP操作员决定立刻运行一个本来计划稍后才运行的版本时,就会出现该情况。
A record indicating when a schedule has been overwritten: this is the case if the WIP operator decides to run Now an edition that has been scheduled to run later.
它可以塑造管理当前和未来员工几乎所有的方面,包括招聘、雇佣、调度、基准、继任计划及确定安全风险。
It can shape nearly all aspects of managing current and prospective employees, including recruiting, hiring, scheduling, benchmarking, succession planning and determining security risks.
根据生产运行计划,掌握生产进度,平衡调度人力、并达到出产需求。
According to the production operation plan, master production schedule, balanced scheduling of manpower and production needs.
应用程序在设计上可拥有多个用户级线程,并将它们计划为由应用程序或libpthread中的pthread调度程序处理。
Applications can be designed to have user-level threads that are scheduled to work by the application or by the pthreads scheduler in libpthreads.
它还具有项目计划,任务调度,任务监控等功能。
It should also be used for project planning, visualization and reporting tasks.
应用推荐