• 研究小组计划下一步进行相关实施,但要保证创造一个光滑表面这样可以阻止纳米颗粒体细胞移动过程中在一起。

    The Purdue team plans to do this next, making sure to create a slippery surface that will stop the nanoparticles from sticking to living cells as they move through the channels.

    youdao

  • 启动计划一项为期5年大型研究计划旨在发现能更好理解大脑衰老过程帮助大脑抵御疾病因素

    This initiative was a large five-year study aimed at better understanding factors that resist disease as the brain ages.

    youdao

  • 好的文章提要也是研究工作的计划研究过程中,应该反复修改这些计划或提要。

    A good outline for the paper is also a good plan for the research program.

    youdao

  • 研究铁路车站作业计划编制过程如何编制调运用计划关键问题

    The key problem of how to make the plan of using yard engines in the process of making operative plans for the station is studied in this paper.

    youdao

  • 研究企业年金管理过程行为控制问题,目标在于提高企业年金基金管理效率保护计划受益人权利最大化目标的实现。

    In order to promote the management efficiency and protect of the beneficiary right, it is necessary to research the behavior model of enterprise annuity process.

    youdao

  • 之所以能取得高质高效成绩,由于工程设计施工以及开通运营过程中采取网络计划、浮拖法等一系列技术、新方法、新措施和软科学研究

    The reason why the construction achieve high quality and efficiency is that a series of new technology and methods were applied in the designing and construction of the project.

    youdao

  • 研究铁路编组站计算机辅助调度过程如何编制到发线运用计划关键问题

    The key problem of how to make the plan of using up-and-down lines in the process of computer aided dispatching for railway marshalling station is stu died in this paper.

    youdao

  • 目前改建计划叫停。原因是研究表明旧址重建钟鼓楼城门将会施工过程中给该地区交通造成额外的巨大压力。

    The plan has now been aborted after studies showed that rebuilding the towering city gate at its original location would create additional traffic chaos during construction.

    youdao

  • 研究铁路车站作业计划编制过程如何编制调机运用计划关键问题

    The key problem of how to make the plan of using shunting locomotives in the process of making operative plans for railway district station is studied in this paper.

    youdao

  • 针对上述问题本文通过项目实施过程中不确定因素分析全面地研究模糊网络计划工程施工应用问题。

    According to the problems above, this paper analyzes the uncertain factor of the project, fully studies the practical problems of the fuzzy Network planning's using in construction.

    youdao

  • 研究铁路车站作业计划编制过程 ,如何编制调机运用计划关键问题

    The key point of dispatching command during the process of drawing operative scheme for railway stations is the shunting locomotive operation plan.

    youdao

  • 研究铁路车站作业计划编制过程 ,如何编制调机运用计划关键问题

    The key point of dispatching command during the process of drawing operative scheme for railway stations is the shunting locomotive operation plan.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定