然后,我们分析访问计划,并决定在长时间的测试运行期间,运行runstats 并重新绑定数据库。
Then we analyzed the access plan and decided to do runstats and rebind the database during a long-running test.
您需要确定的是哪个工具最适合您的应用,以及如何用这个工具在自动化测试运行时收集到的数据计划时间花费。
You will need to determine which tool best suits your application, and how to calculate the time spent by that tool to collect performance data during the automation run.
运行测试的类型,在本例中是性能计划,以及测试运行的主机。
The type of test performed which is a performance schedule in this case and the host where the test was run which is localhost in our scenario.
它显示此测试计划的所有自动测试运行。
如果现在运行数据库单元测试,则数据生成计划将在测试运行开始时一次性填充数据库。
If you run database unit tests now, the data generation plan populates the database one time, at the start of your test run.
如果现在运行数据库单元测试,则数据生成计划将在测试运行开始时一次性填充数据库。
If you run database unit tests now, the data generation plan populates the database one time, at the start of your test run.
应用推荐