正如我们在本文讨论的,如果sql语句中存在主机变量或参数标记,那么DB 2优化器可能会选择一个次优化的存取计划。
As we've discussed in this article, the DB2 optimizer may choose a sub-optimal access plan when there are host variables or parameter markers in the SQL statement.
气候变化应当已经成为了你将来的工作计划,以及知识产权战略的开始中的一个变量。
Climate change should already be one of the variables built into your future business planning and hence your IP strategy.
在这样的情况下,RUP变量的选择可以围绕预期的辅助项目计划的工件分布来考虑。
In such cases, the selection of a RUP variant can revolve around the anticipated distribution of artifacts created as an aid for project planning.
如果计划通过GenerateInitiateGlossary . bat文件导入所生成的Initiate .XML文件,可设置如下变量。
If you plan to import the generated Initiate.XML file through the GenerateInitiateGlossary.bat file, set the following variables.
类型系统自身并没有表现得能够捕获所有计划的不变量。
The type system by itself is not expressive enough to capture all of the intended invariants.
除了按照发明者所计划的方式来使用该语言之外,这样做可避免复制和重新设置局部变量。
This avoids the copying and resetting of the local variables in addition to using the language in the way as it was intended by its inventors.
注意,如果每件事都按计划进行,那么在每件事都成功提交到数据库,而且没有抛出异常之后,result变量应当等于true。
Notice that if everything goes as planned, the result variable will equal true after everything is successfully submitted into the database and no exceptions are thrown.
例如,计划规则可用于定期从存储库(如websphereServiceRegistry andRepository)获取更新全局变量的xml属性文件。
An example use case for a scheduled rule might be periodic fetching of an XML property file from a repository (such as WebSphere Service Registry and repository) that updates global variables.
保险计划的引入同时对于需求和供给的其他变量产生影响。
The introduction of health insurance influences demand and supply and other variables.
本研究呈现的是通过心理模拟来改变计划行为理论变量的第一次尝试。
The present study represents the first attempt to use mental simulations to change the theory of planned behaviour variables.
本文主要介绍网络计划中模糊理论的运用及时间参数作为模糊变量的计算方法和模糊网络关键线路的确定。
In this text, it mainly introduces the application of the fuzzy theory in network planning, and the calculation method of the fuzzy time-parameter, confirmation of the fuzzy "critical path" (CP).
根据人类基因组计划研究的最新成果,对人体系统复杂性进行了多因素变量分析。
Based on the latest achievement of human gene project, the complexity of human body system was discussed by means of multifactor variable analysis.
影响供应链管理的第二个变量是周转率,或是供应环节速度。它取决于获得有效数据的速度,计划周期和执行周期。
The second variable of supply chain management performance is velocity-or the speed of the supply chain . It is governed by the speed of access to good data, planning cycles and execution cycles.
我构建了一个简单保守的模型,并设定了变量,这样如果情况按计划进行,我们就能在保证成本以外额外赚到一些钱。
I built a simple, conservative model, and set the variables so that if things went according to plan, we would make a bit of money on top of covering those costs.
最后对双变量调节计划使用中遇到的问题进行了分析。
At the end of the paper, some problems met in practice for two-variable control system of engine are analyzed.
露天矿的开采必须是有计划的,而且随着影响经济效益变量的变化而变化。
Open-pit Mines should be planed and with the economic benefits index changing the plan should be changed .
露天矿的开采必须是有计划的,而且随着影响经济效益变量的变化而变化。
Open-pit Mines should be planed and with the economic benefits index changing the plan should be changed .
应用推荐