当考虑到发电机报价曲线的影响时,发电计划偏差优化问题是一个高维、离散、约束条件复杂的非线性最优化问题。
Considering the generators bidding prices curves, the generation scheduling error optimization problem is high dimensional, disperse, complex constrained, non-liner problem.
采用计划和跟踪管理方法,并且超出进度来计算偏差,或者。
Adopting a plan-and-track governance method and moving out the schedule to account for the variance, or.
超短期负荷预测结果与原有的发电计划之间难免出现偏差。
The deviation between ultra short term-load forecast and the original generation plan is unavoidable.
在澳大利亚、欧盟、及美国等计划开征碳税的地方,其境内的电力事业机构对于调整碳偏差计划特别感兴趣。
Electric utilities in Australia, the European Union and the U. s., where carbon taxes have been under consideration, are especially interested in carbon-offset projects.
管理全面的计划方案,整理判断偏差的事件,并建议和实施纠正措施;
Manage the overall project planning, organize arbitration and, in event of deviation, propose and implement corrective actions.
考虑到超短期负荷预测偏差的情况下,以购电费用变化量最小为目标函数重新调整发电计划,从而导致电网可用输电能力(atc)发生变化。
Because of super short-term load forecast error, ATC is changing with the adjustment of the generation scheduling by the object function that purchasing charge is least.
针对此现状,提出了一种负荷率偏差法,用于解决直调火力发电单元月度电能交易计划编制问题。
For this status, this paper proposes a new load ratio deflection method for making monthly trade schedule of directly dispatched thermal power generation units.
企业的生产经营总是处于动态之中,实际的运行会与计划有所偏差。
Production and operations is always in dynamic into the actual operation will deviate from plan.
我们可以利用可控收益实际数与计划数的偏差来评价利润中心及其经理的绩效。
We may measure the performance of the profit center or its manager by means of the controllable income variance that is the difference between the actual and planned number of the controllable income.
成就水平活动不会显示进度偏差,这项技术因此就偏向于那些照计划进行的项目数据。
LOE activities will never show a schedule variance. Consequently, the technique always biases the project data toward an on-schedule condition.
针对原系统图形换屏显示时船舶航迹有时位于屏幕一角及航迹偏差带有时宽窄不一致的问题,重新设计了换屏技术及采用了新的偏差带的画法,根据船舶运动计划航线决定船舶进入屏幕的点,保证了船舶位于屏幕中部。
A new method of changing screen is adopted and the point where ship drives into the screen is determined in accordance with the ship's course to make the ship located at the middle of the screen.
摘要:介绍ap1000三门项目首次倒送电的整体进度控制过程,并针对现场执行过程中执行计划与基准计划的偏差进行分析。
ABSTRACT: This paper introduced the progress control process of initial energization in AP1000 Sanmen Project, and provided the analysis direct at schedule variance appeared.
将炼钢连铸生产计划中炉机优化匹配问题归结为一个不允许等待的混合流水车间排序问题来进行研究,提出了一个启发式算法-最小偏差算法。
A hybrid flow shop scheduling problem with no-wait is derived from the optimal matching of furnaces and machines in steel making casting production.
将炼钢连铸生产计划中炉机优化匹配问题归结为一个不允许等待的混合流水车间排序问题来进行研究,提出了一个启发式算法-最小偏差算法。
A hybrid flow shop scheduling problem with no-wait is derived from the optimal matching of furnaces and machines in steel making casting production.