• 当考虑发电机报价曲线的影响时,发电计划偏差优化问题一个高维离散约束条件复杂非线性最优化问题。

    Considering the generators bidding prices curves, the generation scheduling error optimization problem is high dimensional, disperse, complex constrained, non-liner problem.

    youdao

  • 采用计划跟踪管理方法,并且超出进度计算偏差或者

    Adopting a plan-and-track governance method and moving out the schedule to account for the variance, or.

    youdao

  • 短期负荷预测结果原有发电计划之间难免出现偏差

    The deviation between ultra short term-load forecast and the original generation plan is unavoidable.

    youdao

  • 澳大利亚欧盟美国计划开征地方,其境内的电力事业机构对于调整碳偏差计划特别感兴趣

    Electric utilities in Australia, the European Union and the U. s., where carbon taxes have been under consideration, are especially interested in carbon-offset projects.

    youdao

  • 管理全面计划方案整理判断偏差事件,并建议实施纠正措施

    Manage the overall project planning, organize arbitration and, in event of deviation, propose and implement corrective actions.

    youdao

  • 考虑短期负荷预测偏差情况下,电费用变化量最小目标函数重新调整发电计划,从而导致电网可用输电能力(atc)发生变化。

    Because of super short-term load forecast error, ATC is changing with the adjustment of the generation scheduling by the object function that purchasing charge is least.

    youdao

  • 针对现状提出一种负荷率偏差用于解决直调火力发电单元月度电能交易计划编制问题。

    For this status, this paper proposes a new load ratio deflection method for making monthly trade schedule of directly dispatched thermal power generation units.

    youdao

  • 企业的生产经营总是处于动态之中,实际运行计划有所偏差

    Production and operations is always in dynamic into the actual operation will deviate from plan.

    youdao

  • 我们可以利用可控收益实际计划偏差来评价利润中心及其经理绩效

    We may measure the performance of the profit center or its manager by means of the controllable income variance that is the difference between the actual and planned number of the controllable income.

    youdao

  • 成就水平活动不会显示进度偏差这项技术因此偏向于那些照计划进行的项目数据

    LOE activities will never show a schedule variance. Consequently, the technique always biases the project data toward an on-schedule condition.

    youdao

  • 针对系统图形换显示时船舶航迹有时位于屏幕一角航迹偏差带有时宽窄不一致的问题,重新设计换屏技术及采用新的偏差带的画法,根据船舶运动计划航线决定船舶进入屏幕的点,保证了船舶位于屏幕中部。

    A new method of changing screen is adopted and the point where ship drives into the screen is determined in accordance with the ship's course to make the ship located at the middle of the screen.

    youdao

  • 摘要介绍ap1000三门项目首次送电整体进度控制过程针对现场执行过程中执行计划与基准计划偏差进行分析

    ABSTRACT: This paper introduced the progress control process of initial energization in AP1000 Sanmen Project, and provided the analysis direct at schedule variance appeared.

    youdao

  • 炼钢连铸生产计划优化匹配问题归结为个不允许等待混合流水车间排序问题来进行研究,提出了一个启发式算法-最小偏差算法。

    A hybrid flow shop scheduling problem with no-wait is derived from the optimal matching of furnaces and machines in steel making casting production.

    youdao

  • 炼钢连铸生产计划优化匹配问题归结为个不允许等待混合流水车间排序问题来进行研究,提出了一个启发式算法-最小偏差算法。

    A hybrid flow shop scheduling problem with no-wait is derived from the optimal matching of furnaces and machines in steel making casting production.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定