为了提高预报作业的精度,本文选用了衰减记忆最小二乘法对主要控制站进行实时校正。
In this paper the faded-memory least square method is applied on real-time correction and the variation of forgetting factors influencing on the accuracy of flood forecasting of the basin is studied.
为了提高预报作业的精度,本文选用了衰减记忆最小二乘法对主要控制站进行实时校正。
In this paper the faded-memory least square method is applied on real-time correction and the variation of forgetting factors influencing on the accuracy of flood forecasting of the basin is studied.
应用推荐