根据安装图(或吊点图)的要求,将销座组件用螺栓或焊接方式固定在指定的生根梁上。
Pursuant to requirements in installation diagram (or points hanging diagram), pin boss components are fastened to the appointed rooting beam by bolts or in a welding way.
根据安装图(或吊点图)的要求,将销座组件用螺栓或焊接方式固定在指定的生根梁上。
Pursuant to requirements in installation diagram (or points hanging diagram), pin boss components are fastened to the appointed rooting beam by bolts or in a welding way.
应用推荐