航站楼设计单调、大厅拥挤不堪、乘客推搡碰撞,看到这番景象,不少刚下飞机的外国旅客会有些惊讶:这里的经济实力那么强大,建设面貌怎么如此不堪?
MOVING through a drab terminal with overcrowded halls and jostling passengers, many international travellers are left wondering if this really is the gateway to one of the world's largest economies.
根据专家意见,荷花机场第二航站楼建筑方案最终将在对参赛方案进行设计综合的基础上确定。
According to expert opinion, the Lotus airport terminal building in the second program will be the final entries for the design of a comprehensive program based on.
第5章,运用相关建筑理论,结合设计典例,分析和归纳了航站楼的结构选型及空间形式的艺术表现。
The 5 ~ th chapter takes a full consideration of relevant architecture theories and design cases to analyze and summarize the structure lectotype and artistic representation of space.
给出了一个对某航站楼进行面向性能化设计的火灾危险评估的工程算例。
The methods were used in the performance-based fire protection design of an air-building.
重庆国际机场航站楼候机指廊工程预应力混凝土超长结构设计中,综合考虑了各方面因素;
In the design of the ultralong prestressed concrete structure of the waiting corridor project of airport buildings of Chongqing International Airport, engineers comprehensively considered all factors.
并且以浦东国际机场T1航站楼为例,设计开发基于BIM技术的机场航站楼运维管理平台,就机场航站楼运维管理提出一套全新的解决方案。
Pudong International airport terminal T1, as an example, design and develop BIM technology-based platform for the airport terminal operation and maintenance management, to find a new set of solutions.
航站楼的主体结构采用嵌岩冲孔桩,设计中采用的后压浆预应力管桩是首次在岩溶地区应用。
The bored cast in place concrete piles embedded in rock were used in the main structure. The post grouting prestressed pipe piles adopted in the design were the first time applied in the karst area.
19世纪90年代斯坦斯特德机场航站楼的再创造在全球范围内掀起了模仿狂潮,这是第一次打破传统的框架进行创新性设计。
Stansted airport's reinvention of the conventional terminal in the 1990s was emulated worldwide - this breaks with that model for the first time.
航站楼的主体结构采用嵌岩冲孔桩,设计中采用的后压浆预应力管桩是首次在岩溶地区应用。
The bored cast in place concrete piles embedded in rock were used in the main structure. The post grouting prestressed pipe piles adopted in the design were the f...
航站楼的主体结构采用嵌岩冲孔桩,设计中采用的后压浆预应力管桩是首次在岩溶地区应用。
The bored cast in place concrete piles embedded in rock were used in the main structure. The post grouting prestressed pipe piles adopted in the design were the f...
应用推荐