为确定自激电容值与异步发电机空载建压时间的关系,对建压暂态过程进行了仿真计算和分析。
The relationship between the excitation capacitance and the voltage-buildup time in an induction generator was analyzed using a transient simulation and analysis.
为确定自激电容值与异步发电机空载建压时间的关系,对建压暂态过程进行了仿真计算和分析。
The relationship between the excitation capacitance and the voltage-buildup time in an induction generator was analyzed using a transient simulation and analysis.
应用推荐