在绢云母石英片岩中开挖隧洞,使用多臂钻造孔爆破,出现钻孔有规律的弯曲现象,影响了钻爆速度和成洞质量。
When we dig a tunnel in sericite quartz-schist with dobby drills, regular bending of the boreholes appears, which affects drilling speed and the borehole quality.
针对我国港口和电厂煤码头多次门机主臂架折断事故,从现象分析入手,确定其均为局部失稳而引起整体破坏。
The analysis made in the paper shows that many accidents on the portal cranes furnished to the harbours and power plant coal wharfs in China are caused by the buckling in their main jibs.
非线性屈曲分析结果较之特征值屈曲分析结果更能反映实际情况,得出当吊篮载荷分别为12058N和10126N时,臂节4和伸缩臂会发生局部失稳现象。
The nonlinear buckling analysis is sufficient to simulate the actual situation, draw telescopic arm section 4 and the overall buckling load when the hanging baskets were 12058N, and 10126N.
非线性屈曲分析结果较之特征值屈曲分析结果更能反映实际情况,得出当吊篮载荷分别为12058N和10126N时,臂节4和伸缩臂会发生局部失稳现象。
The nonlinear buckling analysis is sufficient to simulate the actual situation, draw telescopic arm section 4 and the overall buckling load when the hanging baskets were 12058N, and 10126N.
应用推荐