• 膨胀安装系统之前膨胀必须预先充气加压使之达到步骤2测定系统压力

    Prior to installation of the tank in the system the tank must be pre-charged to the system pressure as determined in Step 2.

    youdao

  • 膨胀安装系统之前膨胀必须预先充气加压使之达到步骤2测定系统压力

    Prior to installation of the tank in the system the tank must be pre-charged to the system pressure as determined in Step 2.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定