• 上游尾矿垂直水平联合排渗系统排渗效果数值计算进行了研究。

    The numerical computation of the result of vertical - horizontal combined seepage draining system of tailings dam built by up - stream method was studied.

    youdao

  • 减压排渗联合排渗减压是降低地下水位、防止浸没有效措施。

    With decompress well and drainage ditch to drain and decompress can effectively reduce groundwater level and prevent immersion outside reservoir.

    youdao

  • 减压排渗联合排渗减压是降低地下水位、防止浸没有效措施。

    With decompress well and drainage ditch to drain and decompress can effectively reduce groundwater level and prevent immersion outside reservoir.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定