• 金沙江中游梯级水电站通过计算得到了合理联合优化调度方案

    Taking the cascade hydropower stations of the middle Jinsha River as an example, a reasonable optimal dispatching solution is obtained through calculation.

    youdao

  • 建立了梯级水电站中长期联合优化调度模型采用逐步优化算法对其进行求解

    A model of mid-long term optimal dispatching of cascade hydropower stations is established and a solution is given using progressive optimality algorithm.

    youdao

  • 计算结果表明采用混合优化算法水库联合优化调度可以一定程度提高水资源利用效益具有很强的实用性

    Calculation results show that the use of hybrid optimization algorithm in multi-reservoir optimal operation can to a certain extent, to improve water use efficiency, with strong usability.

    youdao

  • 系统集成了洪水预报、水库调度发电优化数据整编各方面功能进行梯级电站联合调度

    The system combines flood forecasting, power generation optimization, data reorganization and many functions so on and can make joint dispatching of cascade hydropower stations.

    youdao

  • 并应用模型三峡电力系统水电站三峡电站联合运行进行优化补偿调度研究。

    Using this model the optimum compensating dispatching in the cooperation of Three Gorges hydropower station with the hydropower station group within the Three Gorges power system is studied.

    youdao

  • 本文分析径流最大调节程度,进而推选可行联合调度方案,并对调度方案进行优化

    The paper analyses the maximum regulation level of two reservoirs to the runoff, defines the feasible joint operation scheme, optimizes the operation scheme.

    youdao

  • 实验结果表明联合算法得到优化结果劣整数线性规划算法,但是优于调度算法

    The result shows that the combining algorithm can arrive at worse code than ILP but better than list scheduling.

    youdao

  • 三峡工程联合通航调度滚动时域调度混合整数规划混合优化算法

    The Three Gorges Project; navigation co-scheduling; rolling horizon procedure; mixed-integer programming; hybrid optimization algorithm;

    youdao

  • 三峡工程联合通航调度滚动时域调度混合整数规划混合优化算法

    The Three Gorges Project; navigation co-scheduling; rolling horizon procedure; mixed-integer programming; hybrid optimization algorithm;

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定