提出了基于模糊网络进度计划的施工索赔工期分析,建立计算模型并使之程序化。
Give the analysis of construction claims construction period based on Fuzzy-network progress plan, and make it as a calculate model program.
指出在考虑施工活动持续时间不确定的条件下,开展施工网络进度计划和优化研究,具有实际意义;
The research on risks and optimization of the construction network program is of significance when the lasting time of the construction is uncertain.
网络计划技术是施工项目管理中行之有效的一种管理方法,在进度计划与管理中得到了广泛地推广与应用。
Network planning technique is an effective manner in construction project management which is popularized and applied widely on progress plan and management.
网络计划进度优化是工程项目管理的关键性问题之一。
Network planning schedule optimization is one of the pivotal issues in engineering project management.
网络计划方法是进度计划与控制的一种基本方法。
Network planing is a kind of basic method for degree of progress plan and control.
图上可直接展示施工进度网络计划的各时间参数,特别是各工作的总时差和自由时差。
The each time parameter of construction schedule network planning in the graph may be exposed immediately, the total float and the free float of each work especially.
PERT技术的网络计划软件是基于编制工程进度计划要求而开发的一种新兴的工程管理技术软件。
Network planning software based on PERT technology is a new kind of project management software developed for compiling schedules for projects.
本文研究的内容是在电梯安装项目中应用网络计划技术进行进度管理。
In this paper, the author focuses on the application of network planning technology in time management of elevator installation project, and raise a whole solution set for it.
目前,工程项目进度计划的编制多采用网络计划方法。
Project network technique is presently a frequently-used method to make project schedule plan.
以某海洋石油工程项目的进度控制管理为例,阐述在设计阶段网络计划的编制、设计过程中进度控制的方法和手段。
By using a real case of an offshore oil project as example, this paper presents the method and approach utilized in the process of framework planning and design stage for schedule control.
为了降低由进度安排不当导致项目实施失败的风险,将时间约束网络应用到项目实施进度计划研究中。
To reduce the risk of project implementation failure brought by unsuitable project schedule, temporal constraint network was applied to the research of project scheduling.
运用网络计划蒙特卡洛仿真(MCS),从宏观的项目层和微观的工序层分别进行进度风险分析。
Using Monte Carlo Simulation (MCS), project schedule risk analysis is implemented at both the macroscopic level of project and the microscopic level of activity.
网络计划技术是项目进度计划的核心技术。
Network planning technique is the key technique of network scheduling and planning.
应用项目网络技术制订BPR进度计划,以计划控制BPR项目进度,对盐业企业重组项目是可行的。
Application for project network technology to develop project plan, and control the progress of BPR projects, it is feasible for salt enterprise restructuring projects.
持续的工作进度和最后的计划将公布在网络上。
[摘要]在工程施工进度网络计划基础上,提出绘制施工进度计划综合横道图的思路及绘制步骤。
Abstract: Based on the construction schedule network planning, this paper puts forward the idea and draw steps of compositive horizontal line graph to construction schedule.
提出了核工程质量与进度集成控制网络计划技术及其网络图模型,介绍了该网络计划的编制和使用方法。
The network planning technique and its' network model is presented for nuclear project quality and schedule integration control.
文章介绍了网络计划技术的原理和建设项目工程进度控制的内容、方法,并举例说明了网络计划技术在进度控制中的应用。
This paper applies the network planning technology to make a quantification analysis of the benefit of EDIs application in port bills circulation circulation.
提出了结合柔性网络计划技术的进度分析与优化方法,包括工期分析及资源优化,在此基础上提出了基于可视化动态仿真的施工进度实时管理与控制方法;
The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;
提出了结合柔性网络计划技术的进度分析与优化方法,包括工期分析及资源优化,在此基础上提出了基于可视化动态仿真的施工进度实时管理与控制方法;
The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;