• 论述了网络计划技术基础,利用计算机编制设备维修计划可行性实用性

    The feasibility and practicability of programming facility maintenance plan, which bases on the technology of network plan and computer, is discussed.

    youdao

  • PERT技术网络计划软件基于编制工程进度计划要求而开发种新兴的工程管理技术软件。

    Network planning software based on PERT technology is a new kind of project management software developed for compiling schedules for projects.

    youdao

  • 目前工程项目进度计划编制多采用网络计划方法

    Project network technique is presently a frequently-used method to make project schedule plan.

    youdao

  • 针对混合流程作业计划编制困难、效率低生成计划可执行性差等问题,提出基于生产流程网络图的时间并行推算法。

    To make easy and efficient production planning for mixed-mode process and improve performance of the planning, a parallel backward inferring algorithm based on flow networks was proposed.

    youdao

  • 海洋石油工程项目进度控制管理阐述设计阶段网络计划编制、设计过程进度控制方法手段

    By using a real case of an offshore oil project as example, this paper presents the method and approach utilized in the process of framework planning and design stage for schedule control.

    youdao

  • 资源网络计划优化工作,编制相应计算程序

    At last, author develops correlative calculation program for single resource scheduling.

    youdao

  • 双代号网络计划放在时间坐标里,编制网络”,使网络识读变得容易。

    The 'time scale network' was worked out by building the dual-code network plan into the time coordinate, which can make the network graph more readable.

    youdao

  • 指出了投标文件编制网络计划必须注意问题。

    This paper also points out what must be taken notice of when the CPM was drawn up in documents of tendering.

    youdao

  • 提出核工程质量进度集成控制网络计划技术及其网络模型,介绍了该网络计划的编制和使用方法。

    The network planning technique and its' network model is presented for nuclear project quality and schedule integration control.

    youdao

  • 网络计划)分析中有最长路线问题及其解法用于计划编制一种方法也是动态规划的方法之一。

    The network(planning)is an approach applying the longest route problem and its solution of the directed graph in the graph theory to scheduling, and it's also one of the dynamic programming approach.

    youdao

  • 网络计划)分析中有最长路线问题及其解法用于计划编制一种方法也是动态规划的方法之一。

    The network(planning)is an approach applying the longest route problem and its solution of the directed graph in the graph theory to scheduling, and it's also one of the dynamic programming approach.

    youdao