这里介绍了应用于鲁布革右岸泄洪洞交通桥吊装的缆索起重机的设计实例。
This paper presents a design example of using a cable crane for lifting and erecting an access bridge for the right bank spillway tunnel for the Lubuge Hydropower Station.
用缆索起重机测量了红松、云杉、冷杉、椴木、杨木、桦木、栬木和榆木等树种原条的重心位置。
The article measures the gravity center locations of tree stems with cable crane, the species of tree stems including korean pine, drangon spruce, fa-ber fir, linden, poplar, birch, elm, etc.
在鲁布革电站、曲靖恭家坝和漫湾电站都曾使用缆索起重机吊装桥梁、闸门、钢管、吊运混凝土罐等。
The cable crane was used for lifting bridges, gates, penstocks and concrete buckets etc, during the construction of the Lubuge, Gongjiaba and Manwan hydropower stations.
根据缆索起重机的实际工作情况给出了缆索起重机承载索张力的计算模型,同时给出了承载索承载能力的计算方法。
This article introduces a calculation model of cable crane on the basis of its working situation, and calculation method of the rope's carrying capacity.
根据缆索起重机的实际工作情况给出了缆索起重机承载索张力的计算模型,同时给出了承载索承载能力的计算方法。
This article introduces a calculation model of cable crane on the basis of its working situation, and calculation method of the rope's carrying capacity.
应用推荐