在项目风险分析中提出了综合风险分析值法的概念与计算公式。
It puts forward the concept and the calculation formula of the theorem of comprehensive risk analysis value in project risk analysis.
在澧水流域防洪体系综合风险分析中的应用,结果表明该方法具有实用性,可为江河防洪规划提供决策依据。
The case study illustrates that these method are practical in integrated risk analysis of flood control system and the results of integrated risk analysis are useful in decision making for…
分析发现,坚持地中海式饮食可使罹患这种综合症的风险降低31%。
The analysis found that adherence to a Mediterranean diet was associated with a 31% reduction in risk of developing the syndrome.
综合识别非常重要,因为一个在此阶段没有界定的风险在下一步分析中同样不会出现。
Comprehensive identification is critical, because a risk that is not identified at this stage will not be included in further analysis.
探讨了尾矿库安全评价应该采用的风险分析方法,建议了一个描述综合评价结果的框架。
Risk analysis method applied in safety assessment on tailing pond is discussed and a frame to describe comprehensive assessment results is suggested.
本文对专家群决策,综合评判,权重分析,模糊灰色物元空间再风险投资中的应用进行了分析与评估。
In this paper, we use the experts - decision, general judgment, weight analysis system, Fuzzy -grey - Element to analyze the venture capital and discuss the statement of the result.
作者引入综合资源论,运用基数方法、序数方法以及风险法从不同侧面对人的价值进行量化分析。
The author introduce comprehensive resources then use base figure method and ordinal number method and risk method that carry on quantitative analysis from different sides.
结合工程量清单计价模式的特点,从承包商的角度对综合单价风险分析方法进行了阐述。
Based on the characteristics of BOQ (bill of quantities) valuation model, this paper elaborates on the risk analysis method for integrated unit price from the perspective of contractors.
通过比较各评估对象的最终综合分析风险值,做出风险排序。
Finally it compares each appraisal object's final generalized analysis risk value and then gets the risk sorting.
通过对高校基建审计风险的内容和成因进行综合分析,有针对性地提出相应防范对策。
Based on the comprehension analysis of contents and the discussion of possible causes for the risks, the paper puts forward the corresponding precautions countermeasures.
岩溶浸没内涝灾害风险评价是指对灾害全过程的综合分析与研究。
The risk evaluation of karst immersion-waterlog-ging hazard refers to the comprehensive analysis and study on the whole process of the hazard.
利用模糊综合评价法对企业资信等级进行定量分析,并提出了商业信贷风险跟踪预警监测的方法。
Using fuzzy comprehensive evaluation to analyse the grade of enterprise credit in fixed quantity, and raising the tracing forewarning control testing method of commercial credit risks.
综合分析发现害虫和螨对阿维菌素存在较大的、潜在抗性风险。
The comprehensive analysis reveals that there is a quite high and potential resistance risk of insect and mite pests to avermectins.
在信用标准制定过程中,应通过综合分析,找出既不影响销售又不会增加风险的最优平衡点。
Credit standards in the process, through comprehensive analysis, to find out will not affect the sales will not increase the risk of the optimal point of balance.
并参考相关资料,提出一种新的环境风险评价方法——综合概率分析法。
Referring to relating materials, we raise a new method of environmental risk assessment-comprehensive probability analysis.
运用索赔风险的模糊综合与辨识模型分析索赔风险,可以迅速而准确地解决这一难题。
The analysis of claims risk by the fuzzy comprehensive and identity model can get this difficult problem solved quickly and accurately.
介绍工业需水量预测的主要方法,综合分析工业需水量预测中的风险因素。
This paper introduces the main method to predict industrial water requirement, to analyse totally risk factors in prediction of industrial water requirement.
最后,根据对本项目的环境影响与环境风险分析,提出了相应的清洁生产与赤泥综合利用的策略。
Finally, based on the analysis of the environmental impacts and the environmental risks, we have put forward the strategies about the clean production and comprehensive utilization of red mud.
风险描述是将危险鉴定、剂量-反应评定和接触评定的结果进行综合分析,来描述农药对公众健康总的影响。
Risk characterization is to answer what is the (extra) risk of health problems likely to result from a pesticide in the exposed population.
本文通过对大型水电站建设进行全面分析,建立水电站建设工期风险评价模型,运用改进的模糊综合评价方法对其进行风险评价。
This thesis analysis the whole construction of the large hydropower station, and establish risk assessment models, and then use the improved fuzzy synthetic discrimination to determine the weight.
目前,国内所运用的风险评价方法主要有专家打分法、模糊综合评判法和层次分析法。
Now, the main estimate methods of risk in our country include the Experts Mark, Fuzzy Integrated Estimation and Analytical Hierarchy Process (AHP).
根据综合集成的思路和方法,通过分析工程风险的复杂性特征,探索工程风险的综合集成管理模式。
According to the ideas and methods of synthetic integration and by analyzing the complex features of engineering risks, a new administrative model of engineering risk is sought for and built.
将模糊综合评价方法应用于工程质量风险管理,结合层次分析法评价了混凝土施工质量风险水平。
Fuzzy math and the theory of AHP are combined to set a fuzzy overall analysis model for the concrete construction quality risk analysis.
该套综合分析方法避免了单项技术分析的多解性,可以提高同类油气藏储层预测的精度,从而降低钻探风险。
This comprehensive method avoids the multi-explain resulted from applying single technique, promotes the precision in predicting similar oil and gas reservoirs, then reduces the drilling risk.
根据风险分析理论,结合模糊综合评定数学模型,提出了一种对大风浪中航行船舶的危险度进行定量估算的模型。
Based on the theories of risk assessment and fuzzy comprehensive assessment, a new model of quantitative assessment to compute the risk degree of navigating ship on heavy sea was put forward.
接着在对比分析各类风险评价方法的基础上,构建了基于模糊综合评价的风险决策模型;
Secondly, after comparatively analyzing various risk evaluation methods, a risk decision-making model of project development based on Fuzzy Assessment was built.
利用向量误差修正模型可以估计最小风险套期保值比,为投资者综合选择风险最小的套期保值策略提供了现实的、可操作的定量分析工具。
VECM model is helpful to estimate the hedge ratio with minimum risk which provides investors a practical and operable implement to choose hedging approaches.
利用向量误差修正模型可以估计最小风险套期保值比,为投资者综合选择风险最小的套期保值策略提供了现实的、可操作的定量分析工具。
VECM model is helpful to estimate the hedge ratio with minimum risk which provides investors a practical and operable implement to choose hedging approaches.
应用推荐