本文运用模糊综合评判理论在施工进度计划全过程管理中,使计划在施工过程中发挥更大的经济效益。
By means of the application of the theory of fuzzy comprehensive judgement for administration of engineering progress project in construction, economic proficiency will be boosted.
文章详细阐述了用挣值法进行费用、进度综合分析与控制,即对已完工作预算费用、计划工作预算费用和已完工作实际费用的分析与控制。
This paper elaborated the comprehensive analysis and control progress on the cost by earned value management which means analyzing and controlling the budget and actual costs.
综合应用进化算法和计算机技术,分两阶段对采掘进度计划实现优化。
Evolutionary algorithm and computer technology are used in combination in optimizing the mining scheduling in two phases.
[摘要]在工程施工进度网络计划基础上,提出绘制施工进度计划综合横道图的思路及绘制步骤。
Abstract: Based on the construction schedule network planning, this paper puts forward the idea and draw steps of compositive horizontal line graph to construction schedule.
[摘要]在工程施工进度网络计划基础上,提出绘制施工进度计划综合横道图的思路及绘制步骤。
Abstract: Based on the construction schedule network planning, this paper puts forward the idea and draw steps of compositive horizontal line graph to construction schedule.