• 龙滩水电站机组蜗壳结构尺寸安装精度焊接要求,焊接环境工期要求

    Longtan hydropower station is large in big structure size of spiral case, high in installation accuracy and welding requirement, poor in welding environment, and short in construction period.

    youdao

  • 本文介绍该产品的设计思路结构特点主要技术数据保护特性外形安装尺寸

    This article introduced the design thinking, structure features, main technical data, protection characteristics, overall and mounting dimensions.

    youdao

  • 通过数值模拟研究获得包括防皱块形式尺寸安装位置在内模具结构制件成形质量的影响规律

    The influence laws of mould structure, including wiper die and the style, size and installed position of mandrel, have been studied.

    youdao

  • 系列电机制成联式结构安装型式尺寸参见直联安装

    Above series motors are available for used in the direct connection between the motor and the gearbox. Please refer to tables below for details.

    youdao

  • 系列电机制成联式结构安装型式尺寸参见直联安装

    Above series motors are available for used in the direct connection between the motor and the gearbox. Please refer to tables below for details.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定