有严格的初检、复检、终检管理制度。
Has strictly initially examines, duplicate examines, examines the control system finally.
成品入库前要按照有关标准和规范进行终检,保证入库合格率100%。
Final products shall be inspected as per relevant standards and specifications before storage, and all final products in storage shall be 100% accepted.
跟踪和控制项目关键点,如原材料采购,质量检验(过程检验、终检)。
Follow up each key point, such as raw material purchasing, quality control (mid-inspection, end-inspection).
出货前的终检以及完善的物流体系,确保产品完好准时地交付到您的手中。
The ex-factory final inspection and well-developed logistics will ensure prompt and damage-free delivery of products.
本制度适用于阀门维修服务部质检员对终检合格的阀门签发合格证的管理。
The system is applicable to the Department of the valve repair service quality inspector found qualified for the final certificate issued by the valve management.
QHSE部:负责工程质量控制管理,各工序施工终检、验收,竣工资料整编等。
QHSE Dept. : be responsible for the project's quality control management, final inspection and acceptance of construction of all processes, reorganize completion data, etc.
不合格品返修件必须经终检员检验合格后,记录于《工序质检记录表》中,方可包装。
D reject rework parts must be approved by the final inspector after passing inspection, in process inspection records "record", before packing.
对超过储存期的成品,出货前成品终检员要分产品型号和类别各抽查一套,如发现有问题时,要开包全检。
The storage period of more than 5.5 of the finished product, shipment of finished final inspector to product models and types of the sample set, if discover a problem, want to open package inspection.
本文完成了RUV4型汽车点火线圈总成终检系统的研制,实现对点火线圈26项动态特性参数的自动测试。
This paper develops the RUV4 automobile ignition coil testing system, which is used to test the 26 dynamic parameters of ignition coil automatically.
本文完成了RUV4型汽车点火线圈总成终检系统的研制,实现对点火线圈26项动态特性参数的自动测试。
This paper develops the RUV4 automobile ignition coil testing system, which is used to test the 26 dynamic parameters of ignition coil automatically.
应用推荐