• 本文简述信息系统开发方法重点介绍了企业系统规划法

    This article briefly formulates the development method of information system and focuses on the introduction of BSP.

    youdao

  • 本文简述信息系统开发方法重点介绍企业系统规划法(bsp)。

    This article briefly formulates the development method of information system and focuses on the introduction of BSP (Business system Plan).

    youdao

  • 定位企业战略运用关键成功因素法企业系统规划法本文探索了一种IT规划框架模型

    Base on enterprise strategic, a new model of IT planning framework is explored in which the critical success factors (CSF) method and enterprise system planning (BSP) method is applied.

    youdao

  • 阐述动态规划法最小轧制能耗时复二重线材轧机孔型系统进行优化设计方法。

    The optimization design for the groove system in double duo wire mill by dynamic programming were briefed according to minimum total rolling energy consumption.

    youdao

  • 作物模型作物水响应相关研究目前采用最小二乘法进行参数动态规划法系统进行优化。

    At present, usually parameters and systems have been optimized by least square techniques and dynamic programming in the research of crop water model and crop response to water and salt.

    youdao

  • 在相同计算条件下,采用一维、二维离散微分动态规划法以及系统分解协调分别进行求解。

    The discrete differential dynamic program method and the large scale system decomposed-coordinating method are adopted to solve the models.

    youdao

  • 运用方法,给出了一种适用于中药智能配药系统控制优化算法——有限动态规划法

    Using this method, this article chooses a relatively better control algorithm named restricted dynamic programming (RDP) for this system.

    youdao

  • 台三绕组变压器组成系统进行计算结果令人满意,验证基于动态规划法求解问题可行的和有效的。

    The calculation result of power system composed of two three-coil transforms is satisfying, which proves it available to solve the problems on base of dynamic programming method.

    youdao

  • 本文提出一种新的计算电力系统机组最优组合算法——网络规划法

    A new approach is presented for solving the unit commitment problem based on network programming techniques the concept of graphs and networks is introduced in this paper.

    youdao

  • 本文叙述了采用非线性规划法进行电力系统电压优化一种实用方法,数学模型为梯度

    This paper describes a non-linear programming algorithm for the optimization of voltage and reactive power in the electric power system. The reduced gradient method is used in the algorithm.

    youdao

  • 通过船舶实例的仿真研究,表明序列二次规划法达到降低系统能源消耗的目的,并且避免了奇异结构增加系统的可操纵性。

    The simulation of the sample indicates the sequential quadratic programming method can reduce the energy consumption, avoid singular configuration and increase maneuverability.

    youdao

  • 系统也是一个复杂动态系统所以必须应用动态规划法去处理

    Therefore we must study it in a big system of resources optimization. 2 )The system is also a complicated dynamic system.

    youdao

  • 系统也是一个复杂动态系统所以必须应用动态规划法去处理

    Therefore we must study it in a big system of resources optimization. 2 )The system is also a complicated dynamic system.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定