• 悬挂防渗墙显著提高抵抗管涌破坏的能力,防渗墙布置堤防下游上游有效

    Suspended cut-off wall can effectively increase foundation resistance to piping and it is more efficient when it is situated in land side than in river side.

    youdao

  • 同时坝基厚度改变情况下,分别探索了渗流量、直径测压管水头、管涌破坏时间变化规律

    Meanwhile, in the case of the change of foundation thickness, the law of seepage amount, sand ring diameter, piezometric head, piping breach time etc were respectively explored.

    youdao

  • 薄时,将发生深层管涌破坏管涌破坏涉及浅砂层及下部砂砾石层,其宽度深度较双层堤基,出口涌砂量也较多。

    But for triple stratum foundation, if the top sand layer is relatively thin, piping is vertical. The damage zones are large in width and depth that expand to the sand layer and gravel layer.

    youdao

  • 提出填充系数理论制订土体渗透破坏形式填充系数判别式管涌临界破坏坡降计算图。

    The filling coefficient theory was put forward, a criterion for the filling coefficient of soil stratum failure and a critical hydraulic gradient chart were formulated.

    youdao

  • 由于现场钻孔管涌试验所得坝基岩体试验破坏坡降较大不足以反映断层破碎带最差部位的岩体破坏坡降。

    The hydraulic gradient gained from the permeability testing in the site is higher and can not reflect the real hydraulic gradient of the heavily fractured rock.

    youdao

  • 由于现场钻孔管涌试验所得坝基岩体试验破坏坡降较大不足以反映断层破碎带最差部位的岩体破坏坡降。

    The hydraulic gradient gained from the permeability testing in the site is higher and can not reflect the real hydraulic gradient of the heavily fractured rock.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定