在作业加工时间简单线性恶化下,提出作业的非负开始和停止延迟恶化率,构造了满足约束条件的复合作业。
Under the simple linear deteriorating, nonnegative start and stop lag deteriorating rates are introduced so as to combine jobs and construct composite jobs satisfying precedence relations.
在作业加工时间简单线性恶化下,提出作业的非负开始和停止延迟恶化率,构造了满足约束条件的复合作业。
Under the simple linear deteriorating, nonnegative start and stop lag deteriorating rates are introduced so as to combine jobs and construct composite jobs satisfying precedence relations.
应用推荐