• 安装顺序沿纵向由一端另一端,水平向上进行。

    The installed order is done along the longitudinal direction of bridge to the vertical bars and to the horizontal bars from below to top.

    youdao

  • 安装顺序沿纵向由一端另一端,水平向上进行。

    The installed order is done along the longitudinal direction of bridge to the vertical bars and to the horizontal bars from below to top.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定