因为有些画是直接在其他被擦掉的画上面创作的,所以一幅画的价值很可能会随着它所描绘的迁移过程的结束而消失。
Because some paintings were made directly over others, obliterating them, it is probable that a painting's value ended with the migration it pictured.
但是迁移过程提出了一个挑战。
本文的下一小节将描述迁移过程。
我相信,这一定是一个完全不同的转移过程。
这极大地简化了WAR迁移过程。
现在我们看看迁移过程的细节。
转移过程大约花费两分钟时间。
执行两步骤迁移过程的第二步的工具。
Tool that performs the second step of the two-step migration process.
执行两步骤迁移过程的第一步的工具。
Tool that performs the first step of the two-step migration process.
迁移过程也基于此后台引擎。
迁移过程分为以下五个步骤。
The process of migration is summarized in the following five steps.
然而,有时这种迁移过程并不是无缝的。
However, sometimes this transition process does not happen seamlessly.
执行尝试性的迁移过程,是非常关键的。
单击Migrate按钮完成迁移过程。
只对与迁移过程相关的那些步骤进行解释。
选择合适的选项,并等待迁移过程的完成。
Choose the appropriate option and wait for the migration to complete.
本文解释了从isa到oat的迁移过程。
The article has explained the migration process from ISA to OAT.
现在我可以休息一下,观看迁移过程自动进行了。
迁移过程包括两大主要步骤,实例迁移和数据库迁移。
The migration contains two major steps, the instance migration and the database migration.
本系列第2部分是一个教程,逐步演示实际迁移过程。
Part 2 of this series will be a tutorial, walking you through the actual process of migration.
回滚整个单元以后,可以根据您的选择重新启动迁移过程。
After rolling back the entire cell, you can restart the migration process at your option.
对于渐进式方法,迁移过程必须划分为多个可管理的部分。
For the incremental approach, the migration must be broken down into manageable parts.
这个迁移过程的目标是提高经济有效性和降低总拥有成本。
The goals of this journey are to keep improving cost efficiencies and keep lowering total cost of ownership.
当目标系统从源系统接收到最新的脏页面时,转移过程结束。
When the target system receives the last dirty page from the source system, the migration is complete.
在本文中,使用一个场景示例演示XML应用程序的迁移过程。
In this article you go through an XML application migration process using an example scenario.
在开发人员完成迁移过程之后,他就会遇到互操作性和性能问题。
Shortly after the developer completes the migration process, he encounters interoperability and performance issues.
当迁移中丢失了资源时使用这种方法,不需要执行整个的迁移过程。
Use this method when part of the resources is missed in the migration and it is not necessary to perform the whole migration.
如果可能,一直等到迁移过程结束,系统重新启动到新版本aix。
If possible, wait until the migration has finished and the system has been rebooted on the new version of AIX.
如果一个或多个文件丢失,甚至配置设置错误,迁移过程就会失败。
If one or more of these files is missing, or even if some of the configurations are changed to incorrect values by mistake, the migration process fails.
总之,根据需求、约束以及源环境的类型,迁移过程会采取特定的步骤。
In summary, the migration process takes a unique procedure, depending on the requirements or constraints and the source type environment.
应用推荐