通过比选最终确定为三心圆单曲拱坝,坝身不布置泄洪建筑物,从而实现了碾压混凝土的快速施工。
Through the comparison the three center single arch dam was finally selected, thus high speed construction of the roller compacted concrete can be put in practice.
溪柄碾压混凝土薄拱坝设计采用了仿真的材料热学参数。这些参数是在预测的施工温度条件下进行的材料实验中测定的。
Experimental thermal parameters of concrete material considering the temperature conditions during construction were used in the design of Xibing Roller Compacted Thin Arch Dam.
贵州大花水水电站碾压混凝土双曲拱坝、重力坝开挖采用深孔梯段微差爆破。
The excavation of the rolled concrete double-curvature arch dam and gravity dam in Dahuashui hydroelectric station in Guizhou adopted deep-hole graded slight differences demolition.
蔺河口水电站大坝为碾压混凝土双曲拱坝。
The Linhekou Hydropower Station has a RCC double-curvature arch dam.
研究碾压混凝土重力拱坝在不同的荷载组合工况下的应力分布状态和分布特征以及最大应力出现的位置和应力控制的标准。
It researches the stress condition, stress distribution, location of maximum stress and stress control criteria of RCC gravity-arch dam under different load combinations.
园满贯碾压混凝土双曲拱坝地质条件复杂,坝区内有八组裂隙和九条较发育的小断层。
The geological condition of Yuanmanguan RCC double-curvature arch dam of very complex, and there are eight crannies and nine faults.
研究坝体变位大小和坝体变形的范围,比较其它工程及国际工程经验,探索碾压混凝土重力拱坝坝体变位控制范围。
It researches displacement and dam body deformation extent. And it tries to find a control range for RCC gravity-arch dam displacement by comparing with other international projects.
研究坝体变位大小和坝体变形的范围,比较其它工程及国际工程经验,探索碾压混凝土重力拱坝坝体变位控制范围。
It researches displacement and dam body deformation extent. And it tries to find a control range for RCC gravity-arch dam displacement by comparing with other international projects.