• 实践证明tBM地质条件下施工过程刀具费用要达到机组施工成本的三分之一左右

    Practice has shown that disc cutters cost is about one-third of the total cost of TBM working, when the TBM is breaking hard rock.

    youdao

  • 通过铀矿坑口堆浸法工艺流程分析,总结出坑口堆浸成本由矿石开采费用主要原材料费用14项要素组成,并建立了地质经济评价模型。

    By analyzing the technical flow of pithead heap-leaching uranium deposits of hard-rock type, the authors analyze its 14 cost items such as ore mining fee and major materials fee etc.

    youdao

  • 通过铀矿坑口堆浸法工艺流程分析,总结出坑口堆浸成本由矿石开采费用主要原材料费用14项要素组成,并建立了地质经济评价模型。

    By analyzing the technical flow of pithead heap-leaching uranium deposits of hard-rock type, the authors analyze its 14 cost items such as ore mining fee and major materials fee etc.

    youdao