借助软件技术可以加速科技研究的进度和深度。
Software technology can increase the pace of process and depth of scientific research.
全文包括七部分:引言:这部分内容简要地介绍了进行语文国家课程校本化实施研究的理论价值和实践意义,以及本研究的进度和取得的成果。
The essay consists of 7 points: Introduction presents the implementation theory value of Chinese national school-based curriculum and its practical significance, and its development and achievement.
井研究此给予用户如进度指示器的视觉反馈的重要性和记录。
The importance of giving users visual feedback, such as progress indicators, has been well researched and documented.
位置细胞是如此的逼近实际的轨迹,以至于研究者可以通过监视在特定时间上哪些位置细胞被激活,就能获知老鼠沿着轨迹跑动的进度。
Place cells correspond so closely to exact physical locations that the researchers could monitor the rats’ progress around the track simply by watching which place cells were firing at any given time.
对希格斯粒子的搜寻进度好于预期,大型强子对撞机(LHC)的研究员们称。
The hunt for the Higgs particle is well ahead of schedule, say researchers at the Large Hadron Collider (LHC).
为了加快研究进度,桑基和他的学生埃里克.戴克曼(Eric Dykeman)开发了一种计算单个病毒原子震动模式的方法。
To expedite this search, Sankey and his student Eric Dykeman have developed a way to calculate the vibrational motion of every atom in a virus shell.
同时,对项目的计划与进度控制过程中所使用的具体方法进行了研究,诸如swot分析、SWART原则、WBS分解等。
Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc.
因此,对建设工程施工进度控制进行探索和研究,具有十分重要的意义。
Therefore, to research and explore the construction project construction progress control, has the very vital significance.
如何在施工中提高空冷平台施工质量,加快空冷平台施工进度,成为电建施工单位一个重要的研究课题。
How to improve the construction quality of air cooled platform, speed up the air cooled platform construction schedule, will become the important research topic of power plant construction company.
机动时间特性研究是对项目进度进行科学管理的基础。
The study of float properties is the basis of scientific project planning and controlling.
近年来,他一直在研究和创造“以视觉表达静态媒体的时间进度”为主题的作品。
In recent years, he has also been researching and creating artworks on the theme of "the visual expression of the progress of time and tracks in static media".
在上述研究基础上,制定了具体的风险应对工程措施和非工程措施,有效控制了DS水闸枢纽工程进度风险。
Based on the researches above, the detailed engineering measure and non-engineering measure for risk handling is designed to control construction-schedule risk of DS WKP effectively.
给予用户视觉反馈的重要性已经被很好地研究和记录 过了,例如进度指示器。
The importance of giving users visual feedback, such as progress indicators, has been well researched and documented .
本文的研究能帮助程序开发人员在回归测试中确定需要重测的类和方法和成本估算及制定进度计划。
This research result in efficient regression testing by helping testers decide what classes and methods need to be retested, and in supporting cost estimation and schedule planning.
当前对于项目进度优化的研究集中于以最小的资源增量,实现既定的优化工期。
The current studies on schedule optimization aim at achieving the optimal goals by least additional resources.
文中着重研究了项目管理在成本、质量和进度三个方面的优化问题,分别提出了优化的方法。
The research is mainly focused on the optimization of Project management with Cost, Quality and Progress, puts forward the method of optimization.
为了降低由进度安排不当导致项目实施失败的风险,将时间约束网络应用到项目实施进度计划研究中。
To reduce the risk of project implementation failure brought by unsuitable project schedule, temporal constraint network was applied to the research of project scheduling.
研究并实现了基于B/S模式的铁路工程形象进度图参数化生成系统(PIPGS)。
This paper investigates the design and implementation of project image progress parametric generating system based on B/S model for railway engineering(PIPGS).
对伙伴模型进行了形式化的描述,并重点对动态协作信息的表示,如伙伴学习进度、知识水平、认知能力和协作能力进行了研究。
The expressions of dynamic and collaborative information on peer, such as peer learning schedule, knowledge level, cognitive capability, and collaborative capability, were studied.
本文重点研究了工程项目建设期进度费用优化中资金的时间价值以及工程项目运营收益对项目建设期进度费用优化的影响。
The time value of capital in schedule cost optimization and the influence of the income of running period to schedule cost optimization of engineering project is mainly studied in this paper.
项目挣值管理是迄今为止最有成效的一种进度与费用协调控制方法,然而我国对挣值管理的研究还很有限。
Project earned value management is the most effective co-ordinate control methods of cost and schedule by far, but our research on the earned value management is still very limited.
因此,水闸枢纽工程施工进度预警模型研究具有很强的现实意义和一定的理论价值。
Therefore, it has strong realistic meaning and a certain theory value to study on construction-schedule early-warning model of waterlocks key project.
将项目全寿命周期中影响现金流的建设阶段和运营阶段结合起来研究加气站项目进度问题,构建了项目进度问题的模糊相关机会规划模型。
With a combination of construction and operation stages in project life cycle, gas filling station project schedule was studied, and a fuzzy dependent-chance programming model was established.
为作物育种中多性状遗传进度研究及群体规模估计提出了新的设想。
A new idea served for study on genetic gains of multiple character and estimation of basic population size was represented in the paper.
实例研究表明,本文提出的方法可更好地计划和控制项目的费用及进度目标。
The case study indicates that the method proposed in this article can effectively plan and control project cost and schedule objectives.
与此对应的编程方法的研究,关系到嵌入式系统的开发进度和嵌入式系统的开发成本。
Corresponding research on programming technology matters in the schedule and cost of embedded system's development.
与此对应的编程方法的研究,关系到嵌入式系统的开发进度和嵌入式系统的开发成本。
Corresponding research on programming technology matters in the schedule and cost of embedded system's development.
应用推荐