• 本文探讨座落砂砾覆盖趾板设计问题。

    This paper also approached the design of toe-slab that is constructed on the covering strata of river.

    youdao

  • 小浪底主坝防渗墙坝基砂砾覆盖渗流控制关键工程最深80多米

    The infiltration protection wall of deepest of over 80 meters at Xiaolangdi dam is the key project to control infiltration in the sand and gravel layer at dam base.

    youdao

  • 小浪底主坝防渗墙坝基砂砾覆盖渗流控制关键工程最深80多米

    The infiltration protection wall of deepest of over 80 meters at Xiaolangdi dam is the key project to control infiltration in the sand and gravel layer at dam base.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定