他的大猎犬跳了出来,在栏杆的大理石桩之间看,并把它的头竖向一边。它看上去像是在笑。它正看着我们。
His giant mastiff came bounding out, looked between the marble pilings of the rail, and cocked his head to one side. He seemed to grin. He was looking right at us.
本文通过试验与工程实践,介绍采用碎(砂)石桩及低强度混凝土桩组合构成复合地基的试验成果、计算方法及应用检测成果。
This paper introduces the test results and calculative method by using the composite foundation of sand-stone pile and concrete pile with low strength.
CFG桩是水泥粉煤灰碎石桩的简称,它是由水泥、粉煤灰、碎石、石屑和砂加水拌合形成的高粘结强度桩,和桩间土、褥垫层一起形成复合地基。
CFG pile is short for the cement fly-ash gravel pile, which is mixed to a high bond strength pile with sand and water. CFG pile composite is formed by CFG pile, the soil between piles and cushion.
介绍了用人工砂(包括石屑)试配高强混凝土以及人工砂在预应力高强混凝土管桩生产中应用的情况。
Preparation of high strength concrete with stone sand (stone screenings) and the application of the stone sand in the PHC pipe pile production are presented.
本工程实践表明,高压旋喷桩对一些复杂地基,特别是场地孤石较多时,是一种有效的地基加固方法。
The engineering practice show that, the high - pressure chemical churning pile was effective ground reinforce method in some complex foundations.
对近海海底有块石情况下的灌注桩及远离海岸的承台施工作了阐述,提出了一种在该条件下的施工方法。
This article suggests a method of filling piles in the rubble stone situation and on the offshore seabed.
作者将危岩落石作用于拦石墙的传力机理概化为落石→堤→桩及板→地基的传力过程。
The author generalizes that transmit process of impact force in volley-unstable rock retaining wall is from unstable rock into rock-fall, dam, pile-plate and ground in this paper.
本工艺标准适用于工业和民用建筑中粘土、粉质粘土及含少量砂、石粘土层,且地下水位低的人工成孔灌注桩工程。
This technology is applicable to industrial and civil construction clay, silty clay and containing a small amount of sand, stone clay, and low groundwater levels Artificial hole pile works.
控制点标志设置采用了深桩强制对中观测墩与普通标石相结合的方式;
The control point symbolized the establishment used the deep pile to force to the center to observe the way which the pillar and the ordinary monument unified;
应用钻孔桩机建设澜石水文站自记台在水下施工。
In 2000, pile-driving machine was first used in underwater construction in building Nanshi hydrologic station.
应用钻孔桩机建设澜石水文站自记台在水下施工。
In 2000, pile-driving machine was first used in underwater construction in building Nanshi hydrologic station.