日本首相菅直人要求暂时关闭滨岗核电站,这座老旧的核电站位于一地壳断层附近。
Japan's prime minister, Naoto Kan, demanded a temporary shutdown of the power plant at Hamaoka, an ageing facility near a tectonic fault line.
制造执行系统在生产信息管理系统与设备控制系统之间构筑一座桥梁,连接企业上层管理与工作地之间过去一直被忽略但急需解决的信息断层。
The manufacturing execution systems bridge the gap between the batch oriented business systems and the real- time oriented control systems on the manufacturing plant floor.
制造执行系统在生产信息管理系统与设备控制系统之间构筑一座桥梁,连接企业上层管理与工作地之间过去一直被忽略但急需解决的信息断层。
The manufacturing execution systems bridge the gap between the batch oriented business systems and the real- time oriented control systems on the manufacturing plant floor.
应用推荐