介绍了目标成本管理、运用价值工程进行成本功能分析及实现新产品开发目标成本控制的一般方法。
Management of objective cost, cost function analysis by means of the value engineering and general method realization of objective cost control for new product development are presented.
但是使用到工时单,成本和日程安排等却使更重要的事情如项目利益、风险管理、持份者参与、质素、范围、目标控制等得不到应有的注目。
However, the use of time sheets, costs, and schedules far outweigh the more important issues like project benefits, risk management, stakeholder involvement, quality, scope, and objective control.
实施商旅集中管理项目最主要的目标,是为了让企业可以控制成本,并通过可实施的旅游政策来执行与航空公司签订的协议。
The prime objectives of managed corporate travel programs have been to enable companies to control expenses and to fulfill agreements with airlines through enforceable travel policies.
探讨了培训项目开展过程中培训成本控制的原则、程序和措施,以达到经济效益最优化,实现自立生存的最终目标。
Probed into principle, procedure and measures of training cost control in training program development to realize optimum benefit and final target of self existence.
常用的控制物流成本的方法是零基预算法,目标成本法和责任成本法。
The usual ways to control the logistics cost are as follows, zero - based budget, target cost and responsibility cost.
与行政总厨紧密合作,协助准备定期更新餐饮预算,确保达到预期目标及有效控制成本。
Assists with the preparation and regular update of the Food & Beverage Departmental Budget, in close cooperation with the Executive Chef, ensuring targets are met and costs are effectively controlled.
根据成本控制的动态原理,从确定成本控制的依据入手,提出了确定成本控制目标的步骤和方法。
Based on the dynamic principle of cost control and starting with the assumptions to determine the cost control, this article presents the procedures and methods to determine the cost objective.
参加行动的控制质量和成本有效地实现目标。
Participate in controlling operations quality and cost efficiently to achieve targets.
填充体质量控制的目标是:填充体具有一定强度、充填材料成本低、流动性好、不脱水或少量脱水。
The quality control aims to make backfill body meet its strength requirements and allow backfill material to have a low lost and a good fluidity and dehydrate a little or not.
主要议题包括:对企业的目标,计划和控制的概念,作用,成本如何行为以及如何分析和管理,预算编制和执行措施。
Major topics include: the role of corporate goals, planning and control concepts, how costs behave and how to analyze and manage them, budgeting and performance measures.
正确认识和把握“四大控制”及其之间的关系,对实现项目施工管理“成本低、工期短、质量高、安全好”的基本目标是极其重要的。
Understanding and grasping the "four control" as well as their relationship are very important to reach the basic target of "low cost, short construction period, high quality, and safety".
工程建设项目的成本、进度与质量一起并称为建设项目管理的三大控制目标。
The cost, schedule and quality are the most important aim of control in the construction project.
在企业现有资源约束下,如何用最低的库存成本满足预期的需求是库存控制决策的目标。
In the restriction of enterprise resource, how to satisfy expected requirement under the minimum stock cost is the object of inventory control policy.
进度、成本和质量是工程项目管理的三大控制目标。
Time, cost and quality are the most important control objects of project management.
负责制定工厂运作程序,在合理成本下保证目标生产量和品质质量。主要包括控制程序、监测程序,报告程序以及工厂效率分析。
Establish plant operation procedure to achieve targeted production volume, quality, and cost. This includes control, monitoring, reporting, and analyzing mill efficiency.
传统上,有两个库存控制目标,以维持效率,降低库存成本。
Traditionally, there are two inventory control objectives, maintaining efficiency and reducing inventory cost.
作业成本目标控制系统由前馈、过程、反馈控制三大子系统构成。
The system of activity-based cost control by objectives is formed of the three subsystems: feed forward, course and reaction control.
摘要:工程施工成本控制是工程施工管理的重要内容,也是达成施工企业经营目标的重要途径。
Abstract: Project construction cost control is an important content of engineering construction management, but also an important way to achieve the business objectives of the construction enterprise.
合理控制税收成本,有利于组织财政收入,减少税收对经济的扭曲,实现公平与效率目标。
Reasonable control tax costs, help organize financial income to reduce tax distortions in the economy, to achieve fairness and efficiency goals.
合理控制税收成本,有利于组织财政收入,减少税收对经济的扭曲,实现公平与效率目标。
Control the cost of tax revenue rationally can help to organize the fiscal revenues, reduce the distortion of tax revenue to economic, and reach the goal of fairness and efficiency.
成本。进度控制是管理的主要目标。
既要获取收益又要规避一定的风险,既要实现既定的目标又要节约相应的成本,是风险内部控制流程设计的标尺。
To gain profit and to prevent certain risks as well, to actualize objective on one hand and to reduce cost on the other hand are the design principles of risk internal control procedures.
控制生产成本,提高产品质量以达到年度质量目标。
Control production cost, improve production quality to achieve annual cost quality target.
项目管理是实施建筑工程管理的主要手段,项目成本控制又是建筑工程项目管理中“三大目标控制”之一。
Project management is a main method to managing Architectural Engineering, project cost control is one of the "three main targets control" in Architectural Engineering project management.
目标成本管理是符合石油企业自身特点的成本控制方法。
Target cost management is a cost control method according with oil enterprises' own characteristics.
论述了目标成本预算控制对硼砂企业的重要性,介绍了目标成本预算控制的原理和方法。
Importance of target cost budget control for borax enterprise was discussed. Principles and methods of target cost budget control were introduced.
控制并且降低存货成本是大型机械制造企业生产经营活动追求的目标之一,本文介绍了控制存货的五种有效方法。
One of big mechanical manufacture enterprise's business objects is to control and reduce the inventory cost. Five methods of controlling the inventory cost is introduced.
该模式针对施工阶段的三大目标即质量、进度、成本控制与安全文明生产实行过程控制。
This model mainly focuses on the three objectives during the construction, namely, quality, speed, cost control and process control of safe and civilized production.
该模式针对施工阶段的三大目标即质量、进度、成本控制与安全文明生产实行过程控制。
This model mainly focuses on the three objectives during the construction, namely, quality, speed, cost control and process control of safe and civilized production.