缓冲区设置是关键链法在项目进度管理领域的一个技术突破,通过缓冲区对项目进度进行监控具有实际应用意义。
Buffer sizing is the breakthrough of critical chain in the area of project schedule management, and it makes a practical application on monitoring project.
首先,本文运用工作负荷点系统的评估系统、项目分解结构以及关键路线法构建了基于工作负荷点系统的进度度量监控体系。
First of all, the paper USES work Load Point assessment system, work breakdown structure and critical path method to build the control and monitor system based on the work Load Point system.
启动和监控项目:通过更新业务计划、项目看板和预算报告进行跟踪项目进度和组织项目步骤和结果的回顾。
Launch and monitor the program: track progress by updating Business Plan, program Dashboard and Budget Reports, and by leading reviews of program steps and results.
该方法涵盖从进度缓冲设置到偏差标准的设定,再根据偏差标准和缓冲对项目进行监控的全过程。
The method covers the whole process from setting scheduling buffer to determining deviation standard, monitoring and controlling according to the buffer and deviation standard.
该方法涵盖从进度缓冲设置到偏差标准的设定,再根据偏差标准和缓冲对项目进行监控的全过程。
The method covers the whole process from setting scheduling buffer to determining deviation standard, monitoring and controlling according to the buffer and deviation standard.