无障碍设计在建筑设计时保持优先级,在区域的总体规划中交通和行人流量都刻意区隔,并确保他们可以安全疏散到室外。
Accessibility was made a priority in the circulation of the building; traffic and pedestrian flows are deliberately separated in the master plan of the site, ensuring safety to gather outdoors.
研究与计算结果表明 :该地铁站火灾时 ,站台至站厅的楼梯是整个疏散过程的瓶颈 ,而楼梯的疏散能力主要受人员流量和楼梯的 有效宽度所制约 ,据此提出了相应的解决方法。
The results showed that the width of the staircase from the platform to the station hall would be the bottleneck in the evacuation procedure and the solutions were presented for this case.
研究与计算结果表明 :该地铁站火灾时 ,站台至站厅的楼梯是整个疏散过程的瓶颈 ,而楼梯的疏散能力主要受人员流量和楼梯的 有效宽度所制约 ,据此提出了相应的解决方法。
The results showed that the width of the staircase from the platform to the station hall would be the bottleneck in the evacuation procedure and the solutions were presented for this case.
应用推荐