然后,电缆接线头用穿过套管中心管的牵引绳小ln地拽出。
Then, cable lugs used through the traction rope sleeve center small LN tube pulled out.
youdao
而后将电缆线接线头端部连接到母线上。
The cable wire lug end is then connected to the bus bar.
应用推荐
模块上移
模块下移
不移动