• 电站水库长期运行优化模型及其应用根据系统工程思想,应用线性规划方法建立起来的。

    The optimization model and application of long-term operation of reservoir group of hydropower station were established in according to the system engineering and the linear programming methods.

    youdao

  • 电站工程方案优选属性、多因素多指标系统工程难以直接选择

    The program optimization of a hydropower project, hard to be chosen directly, is a system project with multi-attribute, multi-factor and multi-index.

    youdao

  • 电站性能测试数据,对指导波能系统工程设计理论研究有着重要的意义。

    The data of the performance test of wave power station is important and beneficial to both the wave power station design and to its theoretical research.

    youdao

  • 电站工程方案优选一个多属性、多因素、多指标的系统工程难以直接选择

    The program optimization of anticorrosion project on warship, which is hard to choose directly, is a system with multi-objective decizion.

    youdao

  • 摘要工程人机接口系统工程主控室电站中人机接口最集中地方。

    Abstract: human factors engineering (HFE) is the system engineering of human system interfaces (HSI) which are concentrated in the main control room of the nuclear power plant.

    youdao

  • 摘要工程人机接口系统工程主控室电站中人机接口最集中地方。

    Abstract: human factors engineering (HFE) is the system engineering of human system interfaces (HSI) which are concentrated in the main control room of the nuclear power plant.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定