水电站水库群长期运行优化模型及其应用,是根据系统工程的思想,应用线性规划的方法建立起来的。
The optimization model and application of long-term operation of reservoir group of hydropower station were established in according to the system engineering and the linear programming methods.
水电站工程方案优选是一个多属性、多因素、多指标的系统工程,难以直接选择。
The program optimization of a hydropower project, hard to be chosen directly, is a system project with multi-attribute, multi-factor and multi-index.
波力电站性能测试数据,对指导波能系统工程设计和理论研究有着重要的意义。
The data of the performance test of wave power station is important and beneficial to both the wave power station design and to its theoretical research.
水电站工程方案优选是一个多属性、多因素、多指标的系统工程,难以直接选择。
The program optimization of anticorrosion project on warship, which is hard to choose directly, is a system with multi-objective decizion.
摘要:人因工程是人机接口的系统工程,主控室是核电站中人机接口最集中的地方。
Abstract: human factors engineering (HFE) is the system engineering of human system interfaces (HSI) which are concentrated in the main control room of the nuclear power plant.
摘要:人因工程是人机接口的系统工程,主控室是核电站中人机接口最集中的地方。
Abstract: human factors engineering (HFE) is the system engineering of human system interfaces (HSI) which are concentrated in the main control room of the nuclear power plant.
应用推荐