• 提出考虑能源分区平衡电源规划模型

    A model for power planning with regional energy resources balance taken into consideration is developed.

    youdao

  • 同样能够电源规划得到很好的应用

    It can also be well used in power generation expansion planning.

    youdao

  • 提出一种基于遗传算法电力系统电源规划模型

    A model for the generation expansion planning of power systems based on genetic algorithms (GEP GA) is presented in this paper.

    youdao

  • 电力系统规划由电力负荷预测电源规划电网规划构成

    Power load forecasting is the base of electrical power system planning.

    youdao

  • 本文线性规划模型基础上论述电源规划目标规划模型。

    The purpose of the dissertation is to discuss the goal programming models and its application in electric power plan.

    youdao

  • 配电网无功电源规划提高配电网电压质量、降低重要途径

    Reactive power programming is an important way to improve the voltages of distribution power system and reduce the energy loss.

    youdao

  • 模糊决策应用电源扩展规划中,提出了电源规划模糊决策方法

    Fuzzy decision was applied to the generation expansion planning and a method of fuzzy decision of generation expansion planning has been presented in this paper.

    youdao

  • 第三部分针对配电网无电源规划数学模型,应用改进算法进行求解

    In part three, the paper USES improved ant colony search algorithm to solve the problem of reactive power supply programming.

    youdao

  • 软件用于电网电源规划工作,规划人员提供定量可靠性经济性分析工具

    This software is applied to generation planning of a certain provincial power network to help the power system planner to make the reliability and economics evaluation of system.

    youdao

  • 根据广东省电源现状电源建设开展情况提出了广东省电源规划建设注意几个问题

    According to the status quo and the developing conditions of power sources in Guangdong, some questions needing attention in power source planning and construction in Guangdong are put forward.

    youdao

  • 配电网无功电源规划能够有效地改善电压水平、降低系统安全经济运行具有重要意义

    Reactive power supply programming in distribution network can improve voltage and decrease power loss, it is important for the running of systems more safe and economical.

    youdao

  • 第二部分建立了配电网电源规划两种数学模型模型中增加考虑了无功电源的使用年限

    In part two, two mathematical models for reactive power supply programming in distribution network is presented, the age limit of reactive power supply is added to models.

    youdao

  • 建立了社会停电损失最小为目标启动电源规划模型,用以优化黑启动电源的安装位置容量

    The blackstart power source planning model based on minimization of social interruption cost is proposed to optimize the capacity and location of the blackstart unit.

    youdao

  • 并根据能源、交通及电力需求情况说明华中地区电源规划原则以及电源结构布局,阐述电力系统节能对策

    The principle, power supply structure and arrangement of the power supply plan in Central China are explained and the energy-saving policy is presented in this paper.

    youdao

  • 本项研究针对影响超深亚微米物理设计主要技术难点信号完整性问题,提高电源规划质量的同时,分别扰效应天线效应进行了相应抑制

    As for the SI which is the main problem for VDSM physical design, the design offers a correspondent restraint to crosstalk and antenna while improving power plan.

    youdao

  • 首先对于大多数可能居住偏远地区私家车主他们给将接上电源充电,就算非私有车辆也可以事先规划路线

    Initially, the majority of private owners are likely to be suburbanites, who will charge their cars overnight using domestic sockets, or fleet operators with predictable journey patterns.

    youdao

  • 三峡水电站分配河南电网电力电量方案不仅关系河南电网电源建设规划调度运行而且关系到三峡水电站电力电量效益的发挥。

    The scheme of power supply not only relates to Henan power grid of power construction planning and dispatching& operation, but also relates to benefit of Sanxia hydro- power .

    youdao

  • 其他方面应用电力市场、电力系统扩建规划分布式电源协调控制等,有所提及。

    Its applications in other aspects, e. g. power market, planning of power transmission expansion, control and operation of distribution systems with dispersed power resources are also given in brief.

    youdao

  • 无功电源合理规划运行也是电力系统安全经济运行保障

    Reactive power reasonable planning and operation of the power system is safe and economic operation of protection.

    youdao

  • 研究结果可供放松管制电源建设规划参考

    The research result is available for reference to the power plant construction plan after the deregulation.

    youdao

  • 计算实例表明所用方法电力系统电源扩展规划有效可行的。

    The results show that, the presented methods are valid and feasible for extension planning of power system.

    youdao

  • 通过分析分开电力工业出现一些新的不确定因素,提出了电网规划应对电源建设起指导作用的电力规划模式

    Through analyzing the arisen uncertain factors after the detachment between the power plant and the power grid, a novel mode for power system planning, that power grid pl.

    youdao

  • 解决了电源电源网络规划、线路交叉点及线路导线截面选择问题

    Accordingly, such problems as single power source and multi-power resources network planning, path connection nodes and path wire section are resolved.

    youdao

  • 解决了电源电源网络规划、线路交叉点及线路导线截面选择问题

    Accordingly, such problems as single power source and multi-power resources network planning, path connection nodes and path wire section are resolved.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定