认证级LOCA分析是核电厂设计和安全分析的重要内容之一。
Licensing LOCA analysis is an important issue of Nuclear Power Plant (NPP) design and safety analysis.
电厂调试过程是对电厂设计、设备制造和安装质量的一次全面检查。
The power plant debugging process is to the power plant design, the equipment manufacture and an installment quality overall check.
在此次110K v火电厂设计中,主要是做电气一次部分的设计。
Turn design of hydropower station into in 110kv, mainly do an electric design of the part.
但是,在国内如何使三维模型技术在电厂设计中全面推广应用还是一个新课题。
But how to promote applications of the technology in power plant designs isa new subject.
一个典型的电厂设计因此能在半小时内完成,如果用通用软件则可能需要数天。
A typical plant design can thus be created in under half an hour, but may take days with some fully flexible programs.
该软件对保温油漆设计质量和效率的提高及电厂设计集成系统的拓展和完善具有较高价值。
The software is valuable for improving the quality and efficiency of insulation paint design, and extending and perfecting the integrated design system of power plants.
以河北国华定曲发电厂为例,深入研究了二维不稳定流洪水模型在平原电厂设计洪水中的应用。
The paper researches intensively the flood model of two dimensions not steadying flow being used on the design flood of power plant in plain taking Guohua Dingqu power plant of Hebei for example.
压水堆核岛机械设备的设计和建造规则(RCC - m)是核电厂设计和建造规则系列规范之一。
The design and construction rules applicable to mechanical components of PWR nuclear Islands (RCC-M) are a part of the collection of design and construction rules for nuclear power plants.
因此GTPRO和STEAM PRO提供一个逻辑框架,用一个有条理的方法,引导用户完成电厂设计过程。
Thus GT PRO and STEAM PRO are designed to supply a logical framework that guides the user, in an organized way, through the plant design process.
通用,阿海珐(Areva)和西屋(Westinghouse)这三个相互竞争的集团也在吹捧他们的新设计,声称比现有核电厂设计更为安全。
GE, Areva and another rival, Westinghouse, are also touting new designs that they say are safer than existing nuclear plants.
沃尔德说,当一开始设计核电厂时,监管机构预计,乏燃料棒应该存放在冷却水池里,五年以后捞出来,再经过化学处理而转化为钸。
When nuclear plants were designed, says Wald, regulators anticipated that spent fuel rods would sit in cooling water pools for five years and then be chemically processed and turned into plutonium.
根据计算机模型得出的结果,这种设计可以让风力发电厂效率提高数百倍,下一步就是研究人员的现场测试,看“鱼儿”在陆地上的“游动”。
According to the computer model, this design could increase wind farm efficiency a hundredfold. The next step for the researchers is to do a field test, trying out these fish dynamics on dry land.
煤燃烧前的碳捕捉要复杂的多,需要对电厂进行重新设计。
Far more complicated is precombustion carbon capture, which involves completely redesigning plants.
更早一些的例子是,位于辛辛那提的奇摩尔发电厂,最初的设计是核电厂,但是在运行之前改为燃气发电。
An earlier reactor was the Zimmer Power plant in Cincinnati, which was originally designed as a nuclear plant but it was converted to natural gas before it began operating.
然而,契那发电厂的设计者们利用大量空调部件取代大多数地热发电厂所需地专用部件,从而大幅度地削减开支。
The designers of the plant at Chena, however, managed to slash their capital outlay by substituting mass-produced parts from air-conditioners for the bespoke components of most geothermal plants.
不过,来自加州理工学院的研究者们却称,通过对鱼群的仿生学习,能够设计出效能更高的风力发电厂。
But researchers at the California Institute of Technology say the way fish school will help create more efficient designs for wind farms.
根据这个电脑模型,这样设计出的风力发电厂效能将能比现在提高一百倍。
According to the computer model, this design could increase wind farm efficiency a hundredfold.
目前,核电厂的约85%发电量来自与福岛核电厂类似设计的装置。
Today, some 85% of the electricity generated by nuclear plants comes from facilities of a similar design as Fukushima.
供应了全英8%用电量的约克郡电厂按照技术设计能持续运营到本世纪30年代。
The Yorkshire plant, which provides about 8 per cent of Britain's electricity, is technically able to continue to operate into the 2030s.
日本核能源方面的主管部门原子力安全保安院的发言人大向重胜说道,福岛第一核电厂的紧急发电机的设计在日本其他核电厂也相当的常见。
A spokesman for Japan's nuclear and Industrial Safety Agency, the nation's nuclear-power regulator, said Fukushima Daiichi's emergency-generator design is "fairly prevalent" at other Japanese plants.
此外工程师尝试设计和定位新的发电厂做最小的对环境的破坏。
Also engineers try to design and locate new power plants to do minimum damage to the environment.
对于火电厂中的其它辅机控制系统的设计亦有一定的参考价值。
It is also worthiness to other slave machine control system's design in fire-power plant.
对于火电厂中的其它辅机控制系统的设计亦有一定的参考价值。
It is also worthiness to other slave machine control system's design in fire-power plant.
应用推荐