本文对电力系统自动化装置时钟统一的要求与现状做了分析和阐述,对于GPS在时钟统一问题上的应用做了可行性研究。
The requirement and current state of clock synchronism of automatic devices in power system are analyzed and described, and a feasibility study is made on the application of GPS in clock synchronism.
现代电力系统的规模不断扩大,越来越多的自动化装置被应用于电力系统。
As the size of modern power system gets larger and larger, more and more automatic equipment is applied to power system.
现代电力系统的规模不断扩大,越来越多的自动化装置被应用于电力系统。
As the size of modern power system gets larger and larger, more and more automatic equipment is applied to power system.
应用推荐