• C1变电站电气试验车适用电力变电站及电气化铁路牵引变电所的电力设备工程交接试验及预防性试验。

    The Substation Electrical Testing Coach(EST-C1) is used for high voltage electrical equipment in substation or feeder station's preventive test and project's handing over test.

    youdao

  • 阐述电力线路张力放线自制牵引设计进口设备完全不同新型液压驱动设计方案,该方案使电力线路张力放线液压系统元件国产化得以实现。

    The design of a new type of hydraulic system was introduced, which was totally different from the imports. And the localization of this system has been realized.

    youdao

  • 牵引变压器连接牵引供电系统电力系统核心设备

    The traction transformer is the core equipment that was connected traction power supply system and power system.

    youdao

  • 牵引变压器连接牵引供电系统电力系统核心设备

    The traction transformer is the core equipment that was connected traction power supply system and power system.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定