• 实施配网降损一个百分点工程,建立集中抄收系统一系列技术管理措施,使油田用电增长率最高负荷增长率逐年下降。

    A series of technical and control methods have been adopted to reduce the increase rate of power consumption and maximum load every year, such as the adoption of multiply electricity$…

    youdao

  • 实施配网降损一个百分点工程,建立集中抄收系统一系列技术管理措施,使油田用电增长率最高负荷增长率逐年下降。

    A series of technical and control methods have been adopted to reduce the increase rate of power consumption and maximum load every year, such as the adoption of multiply electricity$…

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定