对于预验收时已做过负荷试验,整体发运到用户的小型加工中心,总体验收时可免做。
For the pre acceptance has done load test, the whole shipment to the small processing center users, general acceptance can do.
我公司自主研发的1.5MW风力发电机组刹车液压系统完成试验并通过用户验收。
Our independently developed 1.5MW wind mill generator hydraulic brake system has finished its testing work and been accepted by customer.
产品出厂后,负责从安装到用户调试验收,直到变电站正式投运的现场技术指导及处理现场问题。
Manufactured products, responsible to users from installation, commissioning acceptance until substation formal powerstation on-site technical guidance and treatment of the problem.
为保证配电自动化产品在用户验收阶段的产品质量,需要进行出厂试验(FAT)与现场试验(SAT),其中,馈线自动化测试是配电自动化系统试验的关键。
The factory acceptance test(FAT)and site acceptance test(SAT)of distribution automation system should be done before system putting into operation in order to ensure the product's quality.
为保证配电自动化产品在用户验收阶段的产品质量,需要进行出厂试验(FAT)与现场试验(SAT),其中,馈线自动化测试是配电自动化系统试验的关键。
The factory acceptance test(FAT)and site acceptance test(SAT)of distribution automation system should be done before system putting into operation in order to ensure the product's quality.