部署和用户接受度测试计划。
最后安装和用户接受度测试在该环境中进行。
This environment is where the final install and user acceptance test takes place.
拥有几个环境可以减少环境之间的竞争,这样用户接受度测试就不会影响性能测试。
Having several environments reduces competition among the environments, so that, for example, user acceptance testing does not interfere with performance testing.
测试:架构师对系统集成和用户接受度测试进行指导,并负责评估进度的正确沟通的持续测试结果。
Testing: the architect directs systems-integration and user-acceptance testing and leads the assessment of ongoing test results for accurate communication of progress.
您需要跟踪发布版本在以下每个环境中的情况:开发、集成、操作接受度测试、用户接受度测试、过渡和生产环境。
You need to track the release as it moves through each environment: development, integration, operational acceptance testing, user acceptance testing, staging, and production.
在向客户生产环境部署所有或部分解决方案可交付性之前,您应该执行用户接受度测试(User Acceptance Test,UAT)。
Before deploying all or part of the solution deliverables to the customer's production environment, you should perform a User Acceptance Test (UAT).
质量保证(Quality Assurance,QA)、用户接受度测试(User Acceptance Testing,UAT)、性能和压力测试都可能带来需要进行评估的问题。
Quality Assurance (QA), User Acceptance testing (uat), performance, and stress testing can all create issues that need to be evaluated.
质量保证(Quality Assurance,QA)、用户接受度测试(User Acceptance Testing,UAT)、性能和压力测试都可能带来需要进行评估的问题。
Quality Assurance (QA), User Acceptance testing (uat), performance, and stress testing can all create issues that need to be evaluated.
应用推荐