制造部负责生产过程半成品或成品检验和试验状态的标识。
The Manufacturing Department is responsible for identifying the inspection and test status of the semi-finished products or the finished products in production process.
采购或生产制造开始之前,合同专业检验试验计划(itp)应充分明确检查、无损检验(nde)和性能试验介入点。
Prior to procurement or commencement of manufacture, the inspection, NDE and performance testing intervention points shall be adequately defined in a contract specific inspection and test plan (ITP).
经核准的检验试验计划(ITP)由生产工程部(PED)发放至所有部门,以便在生产制作期间,确定内部检验和客户检验要求。
The approved ITP will be issued by PED to all departments so that internal and client inspection requirements are identified during manufacture.
介绍了CD -3型岩心钻机研制情况、技术参数、主要特点及型式检验、生产试验和鉴定情况。
Introduction is made on the development, technical parameters, main features, version verification test, production trial and appraisal of CD - 3 core drill.
生产、检验、测量和试验设备先进、齐全。
Producing, measuring and testing facilities are completely equipped.
适用于产品生产全过程的检验和试验状态的标识。
This is applicable to the identification of inspection and test status for the whole production process.
本文通过一系列试验,建议现行的奥氏体不锈钢晶间腐蚀试验标准中的弯曲评定参数进行适当的修改,以有利于工厂生产和检验。
This paper proposed a suggestion for modification bend coefficient in the present standard. It would be beneficial to process of making stainless steel pressure vessels.
负责生产线首件、末件产品检验和试验;
通过生产中的试验例证和检验结果,针对《汽车渗碳齿轮金相检验》标准中“马氏体级别”的概念和评级方法进行了分析和讨论。
The concept and grading method of the "martensitic grade" in the standard of "Metallographic test for Carburizing Auto Gear" were analyzed and discussed according to the experience and test results.
为检验该系统的性能,在胜利油田的试验1井和试验2井进行了生产试验。
To check up the performance of ZTS-172M electromagnetic wave MWD, the field tests in Well 1 and Well 2 were carried out in Shengli Oilfield.
为检验该系统的性能,在胜利油田的试验1井和试验2井进行了生产试验。
To check up the performance of ZTS-172M electromagnetic wave MWD, the field tests in Well 1 and Well 2 were carried out in Shengli Oilfield.
应用推荐